Similar Projects
Go-Kart Facility
New Construction - 50,000 SF
Conception
Tallahassee, FL 32308

Jai Alai and Card Room
New Construction - 100,000 SF
Design
Miami, FL

Live! Resorts Pompano - Master Plan
New Construction - 2,482,473 SF
Design
$10,000,000 CJ est. value
Pompano Beach, FL 33069

Monarch Lakes, Phase II
New Construction
Bidding
Miramar, FL 33027

Cecil T. Hunter Pool Facility Replacement
Renovation, Alteration
Bidding
Pensacola, FL 32501

Longwood/Poquito Bayou Park Dock Extension
Post-Bid
Shalimar, FL 32579

Macdill AFB Marina Wet Slip Repair
Post-Bid
Macdill AFB, FL

F--Debris Removal from FlL Bay and Ever
Results
Everglades, FL

Lake Echo Dock
Results
Lake Alfred, FL 33850

Ibis Golf and Country Club
New Construction, Addition - 25,252 SF
Construction
$5,600,000 est. value
West Palm Beach, FL 33412

Riverland Sport & Racquet Club
New Construction - 2,260 SF
Construction
$500,000 to $1,000,000 CJ est. value
Port Saint Lucie, FL 34987

Willow Lakes - Master Plan
New Construction - 650,000 SF
Design
$595,000,000 est. value
Fort Pierce, FL 34945

Gazebo Replacement Central Park II
Renovation
Bidding
$60,000 est. value
Ormond Beach, FL

Ellie Schiller Homosassa Springs Wildlife State Park - Ranger Residence Replacement
Post-Bid
Homosassa, FL 34446

Repairs Berth #5 Mooring Bitt @ MCSF-BIC
Results
$25,000 to $100,000 est. value
Jacksonville, FL 32226

Last Updated 11/16/2021 08:43 AM
Project Title

Commander Landing Boardwalk Improvements

Physical Address View project details and contacts
City, State (County) Ponce de Leon, FL 32455   (Walton County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Dock/Pier/Marine, Misc. Recreational
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $145,763
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work includes the construction of a new gravel parking lot, sidewalks, porta potty restroom, overnight camping pavilion, timber boardwalks, picnic pavilion, and a new floating dock with ADA kayak loading station. The project also includes the construction of an electrical meter and lines to provide power to the new camping shelter. The project consists of constructing an approximately 6 feet by 225 feet boardwalk over wetlands, including a 21 feet by 6 feet catwalk and an 8 feet by 12 feet kayak and canoe storage area, a 6 feet by 48 feet access pier, an approximately 18 feet by 18 feet terminal platform, two 6 feet by 14 feet catwalks, and an approximately 6 feet by 12 feet kayak and canoe launch slip within Choctawhatchee River.

Details

Division 06 - Wood, Plastics, and Composites, Heavy Timber Construction, Heavy Timber Pier Construction.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks.
Division 33 - Utilities, Electrical Utility Transmission and Distribution, Electrical Utility Services, Electric Meters.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents