Similar Projects
Micro-Milling, Resurfacing, and Traffic Stripe on SR-157
Infrastructure
Bidding
$627,612 to $767,081 est. value
Cullman, AL 35055

Resurface and Traffic Stripe West Main Street Old SR-69
Infrastructure
Post-Bid
Cullman, AL

Scrub Seal Surface Treatment, Bituminous Concrete Wearing/ Leveling Layer and Traffic Stripe
Infrastructure
Post-Bid
AL

Planing And Resurfacing On Commercial Street
Results
$245,000 to $265,000 est. value
Hanceville, AL

Road Resurfacing
Results
Cullman, AL

Full Depth Reclamation, Bituminous Surface Treatment "KJG" and Traffic Stripe
Infrastructure
Post-Bid
AL

Constructing the Planing, Resurfacing, and Traffic Stripe on SR-157 from the Intersection of SR-3 (US-31)
Results
$3,617,037 to $4,420,823 est. value
Cullman, AL

Polypropylene Pipe for the Cullman County Road Department
Infrastructure
Post-Bid
Cullman, AL 35058

Reliance Fire Access Road
Results
$517,305 est. value
Cullman, AL

Full Depth Reclamation With Portland Cement of Cullman County Roads
Infrastructure
Post-Bid
AL

Performing Surface Treatments to Various Roads
Infrastructure
Results
AL

Recycled Asphalt Pavement Millings (RAP)
Infrastructure
Post-Bid
AL

Micro Surfacing to Various Roads
Infrastructure
Results
AL

Constructing the Planing, Resurfacing, and Traffic Stripe on SR-69 From 0.171 Mile South of the Intersection of SR-67 To 0.134 Mile South of the SR-53 (US-231) Overpass in Arab
Infrastructure
Results
$2,278,991 to $2,785,433 est. value
Arab, AL

Cotton Gin Access Road and Turn Lane
Infrastructure
Results
$445,000 est. value
Cullman, AL

Reported 05/11/2022 12:00 AM
Project Title

South Vinemont/ Jack's Family Restaurant CDBG Project

Physical Address View project details and contacts
City, State (County) Vinemont, AL   (Cullman County)
Category(s) Heavy and Highway
Sub-Category(s) Landscaping, Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project generally consists of Roadway widening, drainage improvements, paving and landscaping on High School Road.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents