Similar Projects
Tally Green Pond Improvements
Renovation
Construction
Marietta, GA 30068

Seven Oaks Lake Dam Improvement Project
Renovation
Results
$1,115,881 est. value
Johns Creek, GA

Provision of Lake Louella Dam Improvements
New Construction
Post-Bid
$2,000,000 to $3,000,000 est. value
Suwanee, GA 30024

Russell Creek Reservoir Dam And Spillway System
Renovation
Post-Bid
Dawsonville, GA

Dam Renovation Plans of Melody Lakes Dam
Results
Waverly Hall, GA

Rock Weir Dam to Provide Fish Passage in Augusta, GA
New Construction
Post-Bid
$10,000,000 est. value
Augusta, GA 31805

Glen Emerald Lake Dam Repair
Results
GA

Kedron Dam Spillway and Intake Structure Repairs
Renovation
Results
GA

North Broad River No.33 Watershed Structure Remedial Spillway Repair
New Construction
Results
Martin, GA 30557

Rehabilitation of the Rosedale Dam for Storm Water Retention
Renovation, Alteration
Post-Bid
$5,000,000 to $10,000,000 est. value
Augusta, GA 30909

Noonday Creek Watershed Structure #17
Renovation
Results
Atlanta, GA

Bull Creek Watershed Dam Structures 12 and 14
Renovation
Results
Columbus, GA 31909

Reported 10/12/2021 12:07 PM
Project Title

Initial Sitework for the Fish Passage at the New Savannah Bluff Lock & Dam

Physical Address View project details and contacts
City, State (County) Augusta, GA   (Richmond County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Initial Sitework for the Fish Passage at the New Savannah Bluff Lock & Dam: Project will reroute the existing electrical utilities at the New Savannah Bluff Lock & Dam from the footprint of the future area for a floodplain bench and tying them into one or more temporary power poles at or near the dam. This is required to provide power to the dam throughout the future contract for construction of a Fish Passage at the New Savannah Bluff Lock & Dam. The power and communication lines crossing over water must be at least 52 feet above the water surface. The scope of this project includes demolition (removal) of existing restrooms, fish cleaning station and picnic shelters in the area of proposed floodplain bench and the pump house near the entrance road. This project requires protection of the structures (walls and crypts) around the New Savannah Cemetery from damage during construction. This protection includes repaving of Lock and Dam Road from the entrance of the park to the western edge of the proposed floodplain bench. Project also includes the installation of guardrails on Lock and Dam road around the Butler Creek Bridge.

Details

Division 02 - Existing Conditions, Subsurface Investigation, Demolition, Selective Demolition.
Division 26 - Electrical.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Erosion and Sedimentation Controls, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents