Similar Projects
(CBE) Lab Renovation
Renovation - 24,000 SF
Design
Madison, WI 53715

Sewell Social Sciences 8th Floor - GPC
Renovation
Bidding
$700,000 est. value
Madison, WI 53706

Sewell Social Sciences 8th Floor - MEP
Renovation - 2,782 SF
Bidding
Madison, WI 53706

Negative Pressure Environmental Enclosure(Uw-Mad)[21-0033]
Addition
Post-Bid
Madison, WI

Early Learning Campus Remodel for Entrepreneurial Center
Renovation
Post-Bid
Madison, WI 53704

Chemistry 2nd Floor Wang Lab Renovation
Renovation
Results
Less than $1,010,000 est. value
Madison, WI 53706

Agricultural Dean's Residence Remodel
Renovation
Results
Less than $335,000 est. value
Madison, WI 53706

Truax Campus Civil, Interior Design, Architecture Remodel
Renovation
Construction
Madison, WI 53704

CDBG Minor Home Repair
Renovation
Post-Bid
WI

New CDIS Building A/E Qualifications
New Construction, Addition
Results
$150,000,000 est. value
Madison, WI 53715

CDBG – Major Home Rehabilitation
Renovation
Post-Bid
WI

TX-Fitness Center
Renovation - 64,000 SF
Results
Madison, WI 53704

UWHC A7/B6-2 Infection Disease & Pulmonary Services Lab
Renovation
Post-Bid
Madison, WI 53792

HSLC Academic Affairs - Phase 2- General
Renovation - 5,525 SF
Results
Less than $250,000 est. value
Madison, WI 53726

UWHC John Wall Dr Warehouse Build-out
New Construction
Post-Bid
Madison, WI 53704

Last Updated 02/18/2022 12:18 PM
Project Title

Brittingham House Second Floor

Physical Address View project details and contacts
City, State (County) Madison, WI 53705   (Dane County)
Category(s) Education, Residential
Sub-Category(s) College/University, Single-Family Homes
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work consists of the interior renovation of a portion on the 2nd floor of the Brittingham House, an executive residence. The scope renovates an exisiting second floor powder room, an existing 2nd floor bathroom with finish improvements in a related bedroom and an existing third floor bath. As well as the renovation of an existing bath and bedroom into a new family room space with kitchenette. Work includes electrical, mechanical, and plumbing systems to support the renovation scope.

Details

College/University, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents