Similar Projects
UDOT Culvert Cleaning and Video Contract
Term Contract
Post-Bid

Elevated Culvert Cleaning, Inspecting and Lining
Post-Bid
Salt Lake City, UT 84044

Dry Creek Improvements
Results
Less than $1,000,000 est. value
Sandy, UT

Zone 3 North 3 MG Reservoir Project
Results
Less than $3,200,000 est. value
West Jordan, UT 84088

Fold and Form Pipe Liner
Term Contract
Post-Bid
Taylorsville, UT 84129

Precast Stormwater Box
Results
Less than $7,000 est. value
Riverton, UT

Traverse Ridge Storm Drain
Post-Bid
Draper, UT

Lone Peak Parkway - 12000 South Culvert Extension
Results
Less than $300,000 est. value
Draper, UT 84020

Segmented Pipe Liner
Term Contract
Post-Bid
UT

2550 South 7200 West to 8000 West Surcharge and Culvert Package
Results
$2,800,000 to $3,500,000 est. value
Salt Lake City, UT 84190

10th East Senior Center Retaining Wall
Post-Bid
Salt Lake City, UT 84114

Road and Drainage Improvements - Central Avenue
Results
$300,000 to $400,000 est. value
Millcreek, UT 84107

Hog Hollow Soil Repair
Post-Bid
Less than $175,000 est. value
Herriman, UT 84065

Anna Caroline Drive Bridge
Results
Less than $443,240 est. value
West Valley City, UT 84119

I-80; Culvert Rehabilitation
Post-Bid
$500,000 to $1,500,000 est. value

Reported 11/06/2020 12:00 AM
Project Title

Streambank Stabilization

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84114   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project is to construct bank stabilization measures along Thistle Creek to control erosion. The work involves the following, install boulder retaining wall with Geotextile fabric on the lower boulder, excavate stream deposition from stream channel and place behind boulder wall, harvest willow cuttings and embed willow cutting into gaps of the lower boulders, place borrow (if needed) for roadway fill slope, and broadcast seed on fill slope. The project is located adjacent to US- 89 at milepost (MP) 308.9 per location maps. The work will be per the typical section labeled Boulder Retaining Wall with Willow Cuttings.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents