Similar Projects
Emerging Environmental Requirements Acquisition (EERA)
Design
Less than $49,000,000 est. value

Emerging Environmental Requirements Acquisition (EERA)
Design
Less than $49,000,000 est. value

Chagrin River Access 2021
Bidding
Eastlake, OH 44095

Construction of the Oakwoods Nature Preserve Wetland Restoration Project
Post-Bid
Less than $1,017,600 est. value
Findlay, OH 45840

City of Bellefontaine Blue Jacket Creek Enclosure Project
Post-Bid
Bellefontaine, OH

Rapid Response 6 Environmental Remediation Services
Results
Less than $80,000,000 est. value

Rapid Response 6 Environmental Remediation Services
Results
Less than $80,000,000 est. value

Mentor Marsh Salt Remediation Design/Build
Post-Bid
$12,000,000 est. value
Mentor, OH 44060

Stream Restoration Plan
Results
Less than $499,000 est. value
Whitehall, OH 43213

Ohio Wetland Restoration
Post-Bid
Ottawa, OH

2019 Sunny Acres Floodplain Restoration and Wetland Creation
Results
$140,000 est. value
Hebron, OH 43205

Beaver Creek Restoration Design/Build
Results
Less than $838,340 est. value
Chardon, OH 44024

Woodhill Community Center Below Grade Waterproofing Leak Remediation
Results
$90,000 to $130,000 est. value
Cleveland, OH 44104

Gilliland Nature Preserve Wetland/Natural Area Development
Results
Less than $70,617 est. value
Celina, OH 45822

Two-Stage Ditch and Wetland Restoration
Results

Last Updated 12/23/2020 04:41 PM
Project Title

Brooks Park Wetland Area Restoration Project

Physical Address View project details and contacts
City, State (County) Millersport, OH 43046   (Fairfield County)
Category(s) Environmental
Sub-Category(s) Wetlands/Remediation
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $526,200
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Trade Estimate General Contract $526,200.00 Alternate Bid Item 1 $19,500.00 Alternate Bid Item 2 $33,400.00 Alternate Bid Item 3 $42,300.00 The project involves the construction of Wetland and realignment and restoration of a Stream. Major items of work include: Partial removal of existing parking lot, earthwork for wetland area(s), excavation and shaping of channel and placing of rock material for stream, culvert installation, solar powered pump installation, boardwalk and overlook installation, wetland planting, and repaving & restriping of drive and parking area

Details

Division 02 - Existing Conditions, Environmental Assessment, Natural Environment Assessment, Water Remediation.
Division 32 - Exterior Improvements, Wetlands.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents