Similar Projects
City Wide Street and Utility Reconstruction
Infrastructure
Bidding
$600,000 est. value
Eau Claire, WI

2022 Water Service Replacements
Infrastructure
Bidding
Milton, WI

Private Water Service Line Containing Lead Replacement
Term Contract
Post-Bid
Green Bay, WI

Cole Court Utility Extension
Infrastructure
Post-Bid
Holmen, WI

Amery Keller Avenue Reconstruction
Results
Amery, WI 54001

Sewer and Water Relay and Street Resurfacing
Results
De Pere, WI

Ductile Iron Pipe
Infrastructure
Post-Bid
Madison, WI

Sanitary Sewer and Water Main
Results
Watertown, WI

Valve Boxes
Infrastructure
Post-Bid
Madison, WI

Wisconn Valley Way Water Main TID 5
Renovation
Results
Modena, Mount Pleasant, WI

Tapping Sleeves
Infrastructure
Post-Bid
Madison, WI

North Main Street Watermain Replacement
Results
$300,000 est. value
Verona, WI 53593

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

2021 Street and Utility Construction
Results
Fond du Lac, WI

2022 Street and Utility Improvements
Infrastructure
Post-Bid
Poynette, WI 53955

Last Updated 06/13/2022 12:14 AM
Project Title

North Side Water Main Loop

Physical Address View project details and contacts
City, State (County) Sheboygan Falls, WI   (Sheboygan County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $425,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work of this Contract generally described as the construction of 8-inch and 12-inch diameter potable water main from Hamann Drive to Falls Parc Drive, Hamann Drive to North/South Road, and Willow Drive to Hamann Drive, including valves, fire hydrants, and other appurtenances. Work includes horizontal directional drilling of the water main beneath wetlands and the route for Hamann Drive to North/South Road. Also included is minor asphalt pavement replacement, minor concrete sidewalk replacement, site erosion control, traffic control, clearing and grubbing, and site restoration. Total project length is approximately 2,700 feet.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents