Similar Projects
Bunkerville Park (Thomas Dudley Leavitt Sr Park) Round 17 SNPLMA Park Improvements
Renovation
Bidding
$1,622,000 est. value
Bunkerville, NV 89007

Kiel Ranch Historic Park - Phase IV
Renovation, Infrastructure
Bidding
$1,400,000 to $1,500,000 est. value
North Las Vegas, NV 89030

Lincoln County Fairgrounds Recreation Park Phase III
Renovation
Post-Bid
Panaca, Pioche, NV 89042

Design Build - Outdoor Bleacher
New Construction
Post-Bid
North Las Vegas, NV 89081

Nellis Meadows: Park Improvements Irrigation Renovation and North Parking Lot Rehabilitation
Results
$4,966,543 to $5,227,941 est. value
Las Vegas, NV

Replace Playground Equipment and Safety Surface Systems
Renovation
Results
Las Vegas, NV 89121

MLK & Coralie Single Family Homes
New Construction
Construction
North Las Vegas, NV 89032

Coral Academy of Science
New Construction - 105,000 SF
Construction
$30,000,000 est. value
Henderson, NV

Bicentennial Marketplace - Pad F
New Construction - 16,224 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Henderson, NV 89044

Historic Westside Urban Farm Containers at James Gay Park
New Construction
Bidding
$425,000 to $525,000 est. value
Las Vegas, NV 89106

Replace Playground Equipment and Safety Surface Systems Northeast Group 2
New Construction
Post-Bid
Las Vegas, North Las Vegas, Searchlight, NV 89101

Resurfacing of Cheyenne Sports Walking Track
Results
North Las Vegas, NV

The Mcgill Ballpark South-West End Renovation
Renovation
Post-Bid
McGill, NV 89318

Hollywood Regional Park: Site Improvements Hollywood Regional Park: SNPLMA Walking Trail
Renovation
Results
$19,928,860 to $20,977,749 est. value
NV

Green Valley Park Improvements
Infrastructure
Post-Bid
Fernley, NV

Last Updated 06/02/2022 11:45 PM
Project Title

Ross Gold Park Tennis Court Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Carson City, NV   (Carson City County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $263,385
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Ross Gold Park Tennis Court Project consists of removal and replacement of all existing fencing, clearing and grubbing, demo of: asphalt, PCC, trees, brush and misc. items as shown on the plans. The project also includes construction of PCC curb, sidewalk and driveway apron; 3 on 6 AC parking area, AC patch, electrical conduit, sleeving, post-tension concrete slab, boulder and rock placement, bench and sign installations, acrylic tennis court surfacing, parking lot and court striping and all common phases customarily associated with this type of project. The Contractor will be responsible for obtaining a Nevada Licensed Engineered design for both the fencing and post-tension concrete, any required permits, site safety and protection of public from hazards at all times during construction. Existing infrastructure (signage and striping, driveways, curb and gutter, sidewalk, utilities) will be returned to current or better condition.

Details

Park/Playground, Renovation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents