Similar Projects
Worden Park-East Playground - City of Royal Oak
Renovation, Infrastructure
Conception
$300,000 est. value
Royal Oak, MI 48073

Skatepark - City of Royal Oak
New Construction
Conception
$500,000 est. value
Royal Oak, MI

City Hall Campus Parking Lot Replacement
Infrastructure
Design
Farmington Hills, MI 48336

La Salette Multi-Family Development
New Construction, Infrastructure - 22,923 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Berkley, MI

Install Field Fencing at Community Field 2 and 3
Alteration
Bidding
$300,000 est. value
Berkley, MI 48072

2022 CDBG Sidewalk Improvement Program
Infrastructure
Bidding
$200,000 est. value
Pontiac, MI

Rest Area ADA Improvement Eastern Lower Peninsula - Interior
Post-Bid

Rest Area ADA Improvement Eastern Lower Peninsula - Exterior
Post-Bid

City Hall Campus Parking Lot Replacement Project
Results
Less than $298,362 est. value
Farmington Hills, MI

1.20 MI of Hot Mix Asphalt Shared Use Path, Concrete Sidewalk and Ramps, Pedestrian Signals and Retaining Walls
Results
MI

The Goddard School and Annex
New Construction, Build-Out - 31,564 SF
Construction
$6,500,000 est. value
Beverly Hills, MI 48025

Clawson Park-Upgrade - City of Royal Oak
Infrastructure
Conception
$500,000 est. value
Royal Oak, MI 48073

Eastern Avenue Parking Lots South of Auburn
Infrastructure
Bidding
$500,000 est. value
Rochester, MI 48307

2021 Parking Lot
Post-Bid
Madison Heights, MI

Martin Park Splash Pad Design / Build
Results
Ferndale, MI 48220

Reported 07/15/2022 12:00 AM
Project Title

Richardson Center Improvements - Phase 1

Physical Address View project details and contacts
City, State (County) Commerce, MI 48390   (Oakland County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Fencing, Park/Playground, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $320,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes a paved asphalt parking area, lighting, a paved asphalt pad for eight (8) pickleball courts, associated chain-link fencing & access gates, a concrete plaza area with a covered open-air shelter, park benches, and landscape beds, concrete sidewalks, various landscape plantings, miscellaneous grading, and the construction of a stormwater management system.

Details

Park/Playground, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 26 - Electrical, Exterior Lighting.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting, Planting Preparation, Soil Preparation, Planting Beds.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents