Similar Projects
Broad Street Retaining Wall - 23-12 - City of Bristol
Infrastructure
Conception
$1,800,000 est. value
Bristol, CT 06010

Arch Street Downtown Complete Streets Improvements - City of New Britian
Infrastructure
Conception
New Britain, CT

Cheshire Community Ymca
Alteration
Design
Southington, CT 06489

RFQ Construction Manager at Risk - Reconstruction State Police Firing Range
Demolition, New Construction, Infrastructure
Bidding
$8,543,014 CJ est. value
Simsbury, CT 06089

Site Upgrades at Elms Village, The Highlands, Rochambeau Apartments
Post-Bid
Hartford, CT 06108

Rental of Bridge Repair Units
Post-Bid
Hartford, CT

2021 Reclamation
Results
West Hartford, CT

CY2021 Paving of Roadways
Results
Windsor, CT

New Pool and Bathhouse - Eisenhower Park
New Construction, Infrastructure
Pending Verification
$2,500,000 CJ est. value
West Hartford, CT 06117

New Athletic Complex - Northwest Catholic High School
New Construction, Renovation, Infrastructure
Pending Verification
$10,000,000 CJ est. value
West Hartford, CT 06117

Relocation of Pan Am At-Grade Crossing - City of New Britain
Infrastructure
Conception
$398,000 est. value
New Britain, CT

Tromley Road Reconstruction
Post-Bid
Windsor, CT

CY2021 Milling and Reclaiming of Roadways
Results
Windsor, CT

Stanley Quarter Park Phase II Pave Roadways and Phase III Pave Parking Lots and Install Lighting - City of New Britain
Renovation, Infrastructure
Conception
$1,400,000 est. value
New Britain, CT 06053

Covey Road Bridge Over Bunnell Brook
Renovation
Post-Bid
Burlington, CT 06013

Last Updated 08/01/2022 03:00 AM
Project Title

Farmington River Bike Trail Improvements

Physical Address View project details and contacts
City, State (County) Canton, CT   (Hartford County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bids for an appropriate and qualified company to remove and install 4,380 feet of 3-rail "American Style" split rail system fence on the Farmington River Bike Trail. Remove and install 335 feet of decking on the Farmington River Bike Trail "Flower Bridge".

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents