Similar Projects
Patching and Resurfacing Program
Bidding
FL

Access Road Rehabilitation, Marianna Municipal Airport
Post-Bid
Less than $700,000 est. value
Marianna, FL 32447

Reconstruction of Roads Damaged by Hurricane Michael
Post-Bid
Sneads, FL 32460

County Road 278 Resurfacing Project (From SR 73 to SR 71)
Results
Less than $1,385,807 est. value
Marianna, FL 32448

County Road 162 Resurfacing Project
Results
Marianna, FL 32448

District 3 Asphalt Paving 2020
Post-Bid
FL

Resurfacing
Results
Less than $4,494,255 est. value
FL

Old Cottondale Road - Roadway Improvement and Water System Improvements
Post-Bid
Marianna, FL 32447

Keevers Road Paving Improvement Project
Results
Less than $660,000 est. value
Sneads, FL 32460

Longview Road Reconstruction Project
Post-Bid
FL 32446

Magnolia Street/Church Street Paving Project
Results
Less than $243,490 est. value
Cottondale, FL

CR 277 (Piano Road) from CR 162 to SR 77
Post-Bid
FL

Resurfacing
Results
Less than $5,639,924 est. value

Annual Asphalt Paving and Asphat Pavement Repairs
Term Contract
Post-Bid
Marianna, FL

CDBG-NR Infrastructure Improvements
Results
Less than $663,000 est. value
Marianna, FL 32447

Last Updated 02/23/2021 09:45 AM
Project Title

12th Ave. Reconstruction Project

Physical Address View project details and contacts
City, State (County) Graceville, FL   (Jackson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $515,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes pavement and drainage improvements on 12th Ave from State Road 77 (Cotton Street) to Ezell Street for a total project length of 1.047 miles within the city limits of Graceville Florida. Improvements include milling and resurfacing of the existing pavement from State Road 77 to Brown Street (255 LF) and Full Depth Pavement Reclamation from Brown Street to Ezell Street (5,244 LF). Clearing and Grubbing along with tree and stump removal are also included along with asphalt turnout construction at driveways. Drainage Improvements consist of cross-drain pipe culvert replacement and placement of concrete mitered end sections. Shoulder work, grassing, signing and pavement markings are also included in this project. Bidding Contractors must be prequalified by the DEPARTMENT (FDOT) as required by Section 2 of the current FDOT Standard Specifications for Road and Bridge Construction.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Clearing and Grubbing.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Turf and Grasses, Sodding.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents