Similar Projects
Yeshiva School Dormitory
Renovation - 3,744 SF
Conception
Pittsburgh, PA 15217

Alumni House
New Construction - 3,000 SF
Conception
$500,000 to $1,000,000 CJ est. value
Pittsburgh, PA 15219

Lafayette College - McCartney Street Phase II - Housing and Wellness Center
New Construction - 94,274 SF
Design
$46,000,000 est. value
Easton, PA 18040

Carlisle Barracks JOC
Design
Carlisle, PA 17013

Solebury School
New Construction - 17,815 SF
Sub-Bidding
New Hope, PA 18938

Immaculata University - West Campus Housing - Buildings 4 & 5
New Construction - 36,000 SF
Sub-Bidding
$4,600,000 est. value
Immaculata, Malvern, PA 19345

Capital Village Apartment Bathroom Renovations
Renovation
Post-Bid
Middletown, PA 17057

Capital Village Apartments - Bathroom Renovations - Phase 2
Renovation - 2,658 SF
Post-Bid
Middletown, PA 17057

The Yards at Old State
New Construction - 514,000 SF
Construction
$10,000,000 CJ est. value
State College, PA

Brottier Hall - Phase 3
Renovation - 50,000 SF
Construction
$1,000,000 est. value
Pittsburgh, PA 15219

Mixed-Use Residence Life Building
New Construction - 400,000 SF
Conception
$10,000,000 CJ est. value
Pittsburgh, PA 15282

Yeshiva School Residency
Renovation - 2,640 SF
Design
$125,000 est. value
Pittsburgh, PA 15217

Marcus Hall
Renovation - 6,503 SF
Post-Bid
$600,000 est. value
Berwyn, PA 19312

Student Housing Capacity Expansion
Addition
Conception
Pittsburgh, PA

Chatham University - Shadyside Campus - Dilworth Hall Addition
Addition - 25,000 SF
Design
Pittsburgh, PA 15232

Reported 06/07/2022 02:05 PM
Project Title

East Halls Phase 2-B Bigler, Curtin, and Packer Renovation

Physical Address View project details and contacts
City, State (County) University Park, PA   (Centre County)
Category(s) Residential
Sub-Category(s) Dormitory
Contracting Method
Project Status Construction Commenced January 2022, Construction Completion Expected July 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bidders can prequalify at: https://pq.firstverify.com/Vendor/VendorRegistration Prequalification is not a requirement to submit a bid but is a requirement to work on the project. Contact Clayco with any questions. Renovation of three buildings at East Halls: Curtin and Packer Halls each 7-story 69,939 SF residence halls (plus basement), Bigler Hall a five-story 64,210 SF residence hall (plus basement), as well as project site work associated with Phase 2B.

Details

204,088 SF - 2 Dormitory, 7 Stories, 1 Story Below Grade, 69,939 SF Renovation, 1 Dormitory, 5 Stories, 1 Story Below Grade, 64,210 SF Renovation.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents