Similar Projects
Silver Mountain Pump Station Improvements Project
Bidding
$2,066,000 est. value
San Antonio, TX

East and West Potable Water Pump Stations Rehabilitation
Bidding
$14,283,569 est. value
Dallas, TX

Stringfellow Unit - Replace Pumps and Controls - Pump House #0383
Post-Bid
Rosharon, TX 77583

Replacement of a Lift Station and Force Main
Post-Bid
Wake Village, TX 75501

Lift Station System Replacement
Results
Irving, TX 75062

Lift Station Improvements for Aspen Meadows
Results
TX

North 2 (11.8 MGD) Pump Station
Construction
$4,572,090 to $5,207,102 est. value
El Paso, TX 79925

CR 596 Pump Station Project
Bidding
$2,880,100 est. value
Josephine, TX 75164

Ard Road Pump Station Upgrades Contract 1
Post-Bid
$150,000 est. value
Seagoville, TX 75159

Lift Station Improvements for Verandah Master Infrastructure
Results
TX

HPW - Lift Station Renewal And Replacement
New Construction, Renovation
Bidding
$9,921,000 est. value
Houston, TX

Community ISD Lift Station Upgrades
Post-Bid
Nevada, TX 75173

42" Gravity Outfall Twin Lakes Boulevard
Results
TX

Stonecrest Pump Station Phase I (Auxiliary Power)
New Construction
Bidding
$2,255,034 est. value
Argyle, TX 76226

Lift Station Repair
Post-Bid
Harlingen, TX 78552

Last Updated 04/26/2021 06:28 AM
Project Title

Water Pump Station Improvements

Physical Address View project details and contacts
City, State (County) Elkhart, TX   (Anderson County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $700,000 to $850,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of water pump station improvements at the Newsome Well Site including installation of two (2) high service pumps, two (2) hydro-pneumatic tanks, site work, fencing improvements, yard piping, electrical and controls, and all associated appurtenances. Construction of water pump station improvements at the School Well Site including installation of two (2) high service pumps, site work, yard piping, electrical and controls, and all associated appurtenances. Installation of a backflow preventer and associated appurtenances at the City's elevated storage tank site.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents