Similar Projects
Resurface - US 271
Infrastructure
Conception
$8,727,416 CJ est. value
Hugo, OK 74743

Resurface - US 271
Infrastructure
Conception
$8,727,416 CJ est. value
Hugo, OK 74743

Utilities - US 70
Infrastructure
Design
$265,000 CJ est. value
Hugo, OK 74743

Bridge and Approaches - SH 109
Infrastructure
Post-Bid
$3,561,451 CJ est. value
Grant, OK 74738

Bridge and Approaches - SH 109
Infrastructure
Post-Bid
$3,561,451 CJ est. value
Grant, OK 74738

Slabjacking and Subsealing Services
Infrastructure
Results

2021 City Street Rehabilitation
Infrastructure
Results
$1,100,000 est. value
Hugo, OK

Rebid Hugo Middle School New Cafeteria/Saferoom
New Construction, Infrastructure
Pending Verification
$4,200,000 CJ est. value
Hugo, OK 74743

Resurface - US 271
Infrastructure
Conception
$4,160,300 CJ est. value
Hugo, OK 74743

Choctaw Tribal Services Expansion Project
Addition, Demolition, Infrastructure - 51,000 SF
Post-Bid
$19,000,000 CJ est. value
Hugo, OK 74743

Pavement Rehabilitation (Asphalt) Indian Nation Turnpike
Infrastructure
Results

County Roads (E2070/E2080) - Bridge Rehabilitation
New Construction, Infrastructure
Results
OK

Resurface (Asphalt) US-70
Infrastructure
Results
OK

Resurface (Asphalt) US-70
Infrastructure
Results
OK

Resurface (Asphalt) US-70
Infrastructure
Results

Last Updated 01/19/2023 07:08 AM
Project Title

Bridge and Approaches - US-271

Physical Address View project details and contacts
City, State (County) Hugo, OK 74743   (Choctaw County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $19,692,086 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Bridge and Approaches Us-271: Over Kiamichi Railroad and County Road, 2.4 Miles North of the Texas State Line. Project Length = 0.696 Mile. Counties: Choctaw Calendar Days: 375 DBE Goal: 10.50 Submit Any Questions or Concerns to the Office Engineer Division via: - Email: Odot-prebid.question@odot.org - Phone: (405) 521 - 2625 Each Bid Shall Be Accompanied by a Certified or Cashier's Check or Bid Bond Equal to 5% of the Bid Made Payable to the State of Oklahoma, Department of Transportation, as a Proposal Guaranty. Proposal Checks Will Be Held or Returned by the Department as Per Subsection 103.04 of the State Standard Specifications. ODOT- Call Order 715 - Bridge and Approaches - US-271.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents