Similar Projects
Final Effluent Pump Station And Stormwater Channel Improvements
New Construction
Conception
$12,754,000 est. value
San Jose, CA 95134

BVF Comfort Station and Water Supply
New Construction
Design
$1,000,000 to $5,000,000 est. value
Yosemite National Park, CA

Pump Station Recovery Mitigation Project
Renovation
Bidding
Long Beach, CA

Copper Cove Lift Station 6, 8, 15 and 18 Renovations and Lift Station 12 and 13 Force Main Bypass Project
Renovation
Bidding
$7,190,000 est. value
Copperopolis, CA 95228

LillyHill & L Street Water Booster Station
Renovation
Post-Bid
$1,500,000 est. value
Needles, CA 92363

Bridalveil Fall Comfort Station & Water Supply
New Construction
Post-Bid
Yosemite Lakes, CA

Plant Structural Improvements
New Construction
Results
$2,500,000 est. value
Modesto, CA 95351

Z--CA-Stone Lakes NWR-Pumps Station Replace
Renovation
Results
Elk Grove, CA 95757

1.3 MG Fleming Zone 8 Reservoir and Zone 8 to 9 Pump Station
Renovation
Bidding
$13,000,000 est. value
Irvine, CA

Inspect and Repair Rebuild Eight Turbine Pumps
Renovation
Post-Bid
Redding, CA

Sewage Lift Station Pump Maintenance
New Construction
Results
$330,000 est. value
Carlsbad, Huntington Beach, Laguna Beach, San Clemente, CA

P Street Lift Station Upgrade and Modification
Renovation
Bidding
$3,500,000 to $4,250,000 est. value
Live Oak, CA 95953

Parker Pump Station Replacement
New Construction, Demolition
Post-Bid
$17,400,000 to $19,400,000 est. value
Coronado, CA

Boathouse Lift Station Replacement Project
Renovation
Results
$300,000 est. value
Fremont, CA 94538

Lone Pine Booster Station and Water Storage Project
Renovation, Infrastructure
Bidding
$500,000 to $1,000,000 est. value
Lone Pine, CA

Last Updated 06/16/2022 11:54 PM
Project Title

Ettie Street Pump Station Structural Concrete Repairs Zone No. 12 Project

Physical Address View project details and contacts
City, State (County) Oakland, CA 94608   (Alameda County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $545,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents