Similar Projects
Tree Farm PUD Roundabout
Infrastructure
Bidding
$600,000 est. value
FL

Southwest 62nd Boulevard Resurfacing
Infrastructure
Bidding
Gainesville, FL 32607

Construction Services for Spine Road Improvements
Post-Bid
FL

Forest Brooke Subdivision, Phase 3C and Collector Road 2nd Extension, Phase 1
Post-Bid
Wimauma, FL

I-10 Rest Area Reconstruction
Results

I-10 Rest Area Reconstruction
Results

Add Left Turn Lane(s), Traffic Signals and Lighting- SR 684
Infrastructure
Bidding
$388,634 est. value
FL

TJI North Beach Road Phase II Road Improvements
Post-Bid
Hobe Sound, FL 33455

Milling and Resurfacing/Add Paved Shoulders/Drainage Improvements/Box Culvert Extension
Results
Less than $5,405,459 est. value
FL

Pineapple Complete Streets Project
Post-Bid
$1,119,730 est. value
Melbourne, FL 32935

South Sewall's Point Road Phase 1
Results
$2,915,034 est. value
Sewall's Point, FL 34996

Restore Maintenance Road GATR Site
Post-Bid
Panama City, FL

Economic Development Transportation Project Fund (EDTPF) Infrastructure Improvements Roadway Package
Results
Cape Canaveral, FL 32920

Repair Restore Expeditionary Road
Post-Bid
Panama City, FL 32403

Cons-Sullivanst/0908 - Historic Street Bricking Renovation
Results
Punta Gorda, FL 33950

Last Updated 09/30/2021 04:01 AM
Project Title

Add Left Turn Lane(s) - Paved Shoulders - SR 71

Physical Address View project details and contacts
City, State (County) FL   (Calhoun County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $563,027
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Improvements Under this Contract Consist of the Installation of a Northbound Left Turn Lane, Widening, the Addition of 5 Ft Paved Shoulders and Minor Ditch Grading Along SR 71 Section 0001 Roadway 0101- 1- Mobilization (44403115201) Ls 1.000 0102- 1- Maintenance Of Traffic (44403115201) Ls 1.000 0102- 60- Work Zone Sign Ed 960.000 0102- 74- 1 Channelizing Device- Types I, Ii, Di, Vp, Drum, Or Lcd Ed 2,580.000 0102- 99- Portable Changeable Message Sign, Temporary Ed 134.000 0102-909- Temporary Raised Rumble Strips- Per Day, Includes All Sets And Relocations Da 60.000 0104- 10- 3 Sediment Barrier Lf 2,401.000 0107- 1- Litter Removal Ac 3.810 0107- 2- Mowing Ac 3.270 0110- 1- 1 Clearing & Grubbing (44403115201) Ls 1.000 0120- 1- Regular Excavation (44403115201) Cy 561.400 0120- 2- 2 Borrow Excavation, Truck Measure Cy 1,958.400 0160- 4- Type B Stabilization Sy 2,357.000 0285-701- Optional Base, Base Group 01 Sy 1,366.000 0285-706- Optional Base, Base Group 06 Sy 1,099.000 0327- 70- 12 Milling Existing Asphalt Pavement, 1 1/4" Avg Depth Sy 3,303.000 0334- 1- 52 Superpave Asphaltic Concrete, Traffic B, Pg76-22 Tn 217.200 0337- 7- 80 Asphalt Concrete Friction Course,Traffic B, Fc-9.5, Pg 76- 22 Tn 384.800 0570- 1- 1 Performance Turf Sy 4,344.000 0570- 1- 3 Performance Turf, Sod And Soil- Shoulder Treatment Index 570-010 Sy 1,291.000 0710- 11-101 Painted Pavement Markings, Standard, White, Solid, 6" Gm 0.485 0710- 11-170 Painted Pavement Markings, Standard, White, Arrows Ea 3.000 0710- 11-201 Painted Pavement Markings, Standard, Yellow, Solid, 6" Gm 0.655 0710- 11-224 Painted Pavement Markings, Standard, Yellow, Solid For Diagonal Or Chevron, 18" Lf 90.000 0999- 25- Initial Contingency Amount, Do Not Bid (44403115201) Ls 1.000 Section 0002 Signing 0700- 1- 50 Single Post Sign, Relocate As 10.000 0700- 2- 50 Multi- Post Sign, Ground Mount, Relocate As 1.000 0706- 1- 3 Raised Pavement Marker, Type B Ea 108.000 0710- 90- Painted Pavement Markings, Final Surface (44403115201) Ls 1.000 0711- 11-170 Thermoplastic, Standard, White, Arrow Ea 3.000 0711- 11-224 Thermoplastic, Standard, Yellow, Solid, 18" For Diagonal Or Chevron Lf 90.000 0711- 16-101 Thermoplastic, Standard-Other Surfaces, White, Solid, 6" Gm 0.485 0711- 16-201 Thermoplastic, Standard-Other Surfaces, Yellow, Solid, 6" Gm 0.655

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents