Similar Projects
Apex Community Downtown Streetscape and Parking
Design
Apex, NC 27502

C-5604Aa Kelly And Apex Barbecue Pedestrian Improvements
Bidding
Apex, NC

Parking Lot Asphalt Replacement
Post-Bid
Raleigh, NC 27607

Glen Eden Tennis Access Sidewalk
Post-Bid
Raleigh, NC

New Hope Church Road Improvements and Green Road Sidewalk
Results
Raleigh, NC

James Street to Downtown Pedestrian Improvements
Results
Less than $654,799 est. value
Apex, NC

Chick-Fil-A Sitework
Addition
Construction
Raleigh, NC 27607

Procter Farm Preserve
Post-Bid
Wendell, NC 27591

Parking Lot Replacement - 512 Brickhaven Drive
Results
Less than $800,000 est. value
Raleigh, NC

GoCary Amenity Improvements
Post-Bid
Cary, NC

Southern Wake Campus - ADA Accessibility Upgrades
Results
Less than $1,000,000 est. value
Raleigh, NC

Gocary Bus Amenity Improvements
Post-Bid
Cary, NC

Historic Christian Church Parking Lot Project
Results
Morrisville, NC 27560

Sidewalk Replacement Project
Post-Bid
Raleigh, NC

Bike, Sidewalk and Pedestrian Improvements
Results
Less than $1,090,168 est. value
Cary, NC 27513

Last Updated 04/27/2020 10:24 AM
Project Title

Group 1 - Sidewalk Improvements Project

Physical Address View project details and contacts
City, State (County) Raleigh, NC 27604   (Wake County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,121,635
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consisting of furnishing and installing the following: Erosion control, about 5,675 So. Yard of 4" concrete sidewalk, 320 So. Yard of 6" concrete sidewalk, 390 Sq. Yard of 6" concrete driveway, 15 concrete curb ramps, 690 LF of 2'-6" concrete curb and gutter, and other incidental items of work. The Group 1 Sidewalk Improvements project is a combination of sidewalk installations on Old Deer Trail, Centennial Parkway, Raleigh Boulevard and Hoiston Lane. It consists of installing approximately 720 SY of concrete sidewalk on the east side of Old Deer Trail from Mourning Dove Road to just north of Apple Orchard Way; approximately 1,142 SY of concrete sidewalk on the south side of Centennial Parkway from Avent Ferry Road to Nazareth Street; approximately 1,322 SY of concrete sidewalk on the east side of Raleigh Boulevard from Mount Peace Baptist Church to New Bern Avenue; and approximately 811 SY of concrete sidewalk on the north side of Hoiston Lane from Sunnybrook Road to east of Calumet Drive. The project also furnishes and installs erosion control measures, concrete curb and gutter, concrete bus pads, asphalt paving and some guardrail replacement.

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Roadway Construction, Vehicle Barriers, Impact Attenuating Devices.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents