Similar Projects
Google Middlefield Park Master Plan
New Construction - 3,455,000 SF
Conception
$10,000,000 CJ est. value
Mountain View, CA

Middlefield Park Masterplan
New Construction, Demolition - 1,467,000 SF
Conception
$10,000,000 CJ est. value
Mountain View, CA 94043

The Seminary at Strawberry
New Construction
Design
Mill Valley, CA 94941

Warner Center Life Plan Community - Woodland Hills
New Construction - 758,835 SF
Design
$10,000,000 CJ est. value
Los Angeles, CA 91367

Orange Memorial Park Sports Field Project
New Construction
Bidding
$9,400,000 est. value
South San Francisco, CA 94080

Pre Qualification for Construction of Specific Park Recreation Facilities
Renovation
Bidding
Roseville, CA

Park: All Inclusive Playground - Emma Prusch
New Construction
Post-Bid
$2,250,001 to $2,750,000 est. value
San Jose, CA

Hatch Preschool Playground Project
New Construction
Post-Bid
Half Moon Bay, CA 94019

Tahoe Park Pool Restroom Renovation
Renovation, Infrastructure
Results
$220,570 est. value
Sacramento, CA 95820

Creekside and Meadowbrook Group Area Renovation at Vasona Lake County Park
Renovation
Results
$924,206 est. value
Los Gatos, CA 95032

The Landing at Arroyo and Vintage at Sycamore
New Construction
Construction
$114,000,000 est. value
Simi Valley, CA 93065

Traditions at the Meadow Subdivision
New Construction - 7,500 SF
Pending Verification
$1,000,000 est. value
Martinez, CA 94553

Mixed-Use Residential Village
New Construction
Pending Verification
San Jose, CA 95131

The Creek at Dominguez Hills
New Construction - 199,000 SF
Conception
$10,000,000 CJ est. value
Carson, CA 90746

Icon/Echo Towers
New Construction, Demolition - 478,500 SF
Design
$600,000,000 est. value
San Jose, CA 95113

Last Updated 12/21/2021 12:52 PM
Project Title

Salado Creek Bike Trail Project

Physical Address View project details and contacts
City, State (County) Patterson, CA 95363   (Stanislaus County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,198,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work consists of rehabilitating and constructing new asphalt concrete trail to create approximately 6,500 linear feet of continuous bike and pedestrian path along Salado Creek and American Eagle Avenue from near Sweet Briar Drive to Cliff Swallow Drive. An existing concrete culvert will be modified to create an undercrossing for the new bike path under Sperry Avenue. Masonry and concrete retaining walls will be constructed along both sides of the approaches to the undercrossing. 273 trees will be planted along the path and a new irrigation system will be installed. Approximately 48 trail lights will be installed along the path and connected to existing electrical services. A new storm drain pump station will be constructed at the low point near the undercrossing. Existing water and storm drain pipes will be adjusted to fit the proposed improvements

Details

Park/Playground, Renovation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents