Reported 01/25/2019 12:00 AM
Project Title

Jefferson County Human Resources Renovations Phase I and II A

Physical Address View project details and contacts
City, State (County) Birmingham, AL   (Jefferson County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency - 12/11/18
Owner View project details and contacts
Architect View project details and contacts
Description The work is divided into two phases. The phases are different scopes of work that occur in different buildings. Construction on both phases will commence simultaneously. Phase I - HR Testing 2121 5th Floor: The work consists of interior demolition and renovation on a single commercial office floor. The work includes new floor, wall and ceiling finishes, new lighting and electrical systems, new HVAC systems and new plumbing systems. Not included in the work are the existing elevator lobby, stairways, restrooms, and elevators. The work area is approximately 9,000 SF. The location of Phase I is the 5th floor of the 2121 Building, 2121 Reverend Abraham Woods Jr Boulevard, Birmingham, AL 35203. Work will be performed at night, from 6 pm to 6 am. Phase II - HR Admin Annex 6th Floor. The work consists of interior demolition and renovation on a single commercial office floor. The work includes new floor, wall and ceiling finishes, new lighting and electrical systems, new HVAC systems and new plumbing systems. Selective repairs in the existing restrooms is included in the work. Not included in the work are the existing elevator lobby, stairways, and elevators. The work area is approximately 15,000 SF.
Details Misc. Buildings, 15,000 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents