Similar Projects
Mt Bighorn Warman Loop Road
Term Contract
Design
MT

Y--GAOA Stellar Creek Road Repair
Term Contract
Design
$500,000 to $1,000,000 est. value
Forsyth, MT 59327

Rehabilitate Final 9.3 Miles of the Going-To-The-Sun Road and Replace Bridge Over Mcdonald Creek
Renovation, Term Contract
Bidding
West Glacier, MT 59936

Grading, Gravel, Cold Milling, Crack Seal, PMS Overlay, Digouts, Guardrail, Rumble Strips, and Pavement Markings on the Busby-East and West
Infrastructure
Bidding
MT

Pistol Range, Parking & Road Improvements
Alteration
Post-Bid
Billings, MT

HRDC Community First Griffin Place Site and Infrastructure
Demolition, Infrastructure
Post-Bid

2011-00141 BIA Route #0073 Improvements - Phase III
Infrastructure
Results
MT

Headwaters Trail System Crack Seal and Seal Coat - 2021
Infrastructure
Results
Three Forks, MT 59752

MT Dar 2022(1), Defense Access Roads FY 2022
Term Contract
Design
$5,000,000 to $10,000,000 est. value
Great Falls, MT

Crack Seal, Seal and Cover, Digouts, Bridge Repair, and Safety Improvements on the Apex - Glen
New Construction, Infrastructure
Bidding
MT

Jct Sec 462 - East and West Nh-Nhpb 57-5(47)230
Infrastructure
Post-Bid
MT

Plant Mix Surfacing
Infrastructure
Results
MT

Pavement Preservation, Cold Milling, Crack Sealing, Overlay, Seal and Cover and Pavement Markings
Infrastructure
Bidding
MT

Grading, Gravel, PMS Surfacing, Drainage, Rumble Strips, Fencing and Pavement Markings on the SF 169 Fairfield Curve Improvements
Infrastructure
Post-Bid
MT

Asrwss Fort Peck West Branchlines Project; Phase 2, Phase 3 And Phase 4
Alteration
Results
Poplar, MT 59255

Last Updated 02/09/2022 01:10 AM
Project Title

Sidney Circle Road Improvements

Physical Address View project details and contacts
City, State (County) Sidney, MT   (Richland County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally consists of approximately 22,821 SY of street reconstruction; including, Removal of existing asphalt and curb & gutter, Removal of existing road base, 11,347 LF Curb & Gutter, 20,300 SY Asphalt Paving, Geotextile, Geogrid, Crushed Base, 1,190 SF Concrete Valley Gutters, 3,562 SF Concrete Curb Returns, 4,800 SF of Concrete Driveway Installation, multiple Manhole and Gate Valve adjustments. The work will also include approximately 570 LF of 12” Storm Sewer, 4 Storm Water Manholes, 2 Curb Inlets, and 120 LF of Concrete Arch Culvert, and 230 LF of various sized of CMP culvert.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents