Similar Projects
Pump Repair and Maintenance Services
Bidding
Tucson, AZ

Construction Manager at Risk Services - Well 20 Improvement - Market Place
Bidding
Tempe, AZ

Water Supply And Distribution System Improvements
Post-Bid
Whetstone, AZ

Fuel Pump Dispenser Replacement
Post-Bid
Tucson, AZ

Z--Yuma - 242 Well Expansion
Results
$1,000,000 to $5,000,000 est. value
Yuma, AZ 85364

Y--Construct a Secondary Water Well at Temple Bar, La
Results
$250,000 to $500,000 est. value
AZ

Fuel Pump Maintenance & Repairs at Grand Canyon NP
Post-Bid
Grand Canyon, AZ

Y--Nixon REC/Admin Site Well Drill Project
Results
$100,000 to $250,000 est. value
Colorado City, AZ

Watson Wash Well Abandonment
Post-Bid
Phoenix, AZ

Clean Evaluate Well
Results
Glendale, AZ 85309

Northwest Recharge, Recovery, and Delivery System (NWRRDS) Recovery Well Drilling, Installation, and Testing
Post-Bid
Less than $877,205 est. value
Tucson, AZ 85704

Valentine Well
Results
Phoenix, AZ 85027

Carrizo Production Wells
Post-Bid
$100,000 to $250,000 est. value
Fort Apache, AZ

Irrigation Pump Replacement
Results
Lake Havasu City, AZ 86406

Repair and Reassemble Well #12
Post-Bid
Luke Air Force Base, AZ 85309

Reported 12/11/2020 12:00 AM
Project Title

N--AZ-San Bernardino NWR-Replacement Wells

Physical Address View project details and contacts
City, State (County) Douglas, AZ   (Cochise County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $120,000 to $175,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform abandonment of 3 wells and drilling of 3 replacement wells, on the San Bernardino National Wildlife Refuge (NWR), as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents