Similar Projects
RFQ Design - Professional Consulting Services for 0L7 (Jean Airport) Runway Rehabilitation Project
Infrastructure, Renovation
Post-Bid
$700,000 CJ est. value
Jean, NV 89019

Annual Requirements Contract for Ats Shop and Maintenance Facility Custodial Services
Term Contract
Post-Bid
Las Vegas, NV 89119

Monument Signage
Infrastructure
Results
$114,143 CJ est. value
Las Vegas, NV 89119

Concourse Improvements at D Gates
Renovation
Results
$28,647,688 CJ est. value
Las Vegas, NV 89119

Taxiway E New construction - AIR 22-103 - City of Boulder City
New Construction, Infrastructure
Conception
$3,920,040 est. value
Boulder City, NV 89005

RFQ - Professional Consulting Services for North Las Vegas Airport Master Planning
Term Contract
Post-Bid
North Las Vegas, NV 89032

RFQ Engineering - Professional Consulting Services for Las Holding Pad 7 Reconstruction and Expansion, and Main Gate Reconstruction
Infrastructure
Post-Bid
$500,000 CJ est. value
Las Vegas, NV 89119

Curbside Check-In Kiosk Expansion at T1
Infrastructure, Renovation
Post-Bid
$75,000 CJ est. value
Las Vegas, NV 89119

CMAR Terminal Development - Ticketing Hall Expansion
Renovation
Post-Bid
$24,500,000 est. value
Reno, NV 89502

Front Reception Lobby Area Remodel
Renovation
Post-Bid
$120,000 est. value
Reno, NV

Airport Duty Managers Office Remodel Project
Build-out
Post-Bid
$500,000 CJ est. value
Reno, NV 89502

Shared Use Phase 1 Podiums
Renovation
Bidding
$250,000 CJ est. value
Reno, NV 89502

Last Updated 01/05/2023 03:04 PM
Project Title

Terminal 1 Relocate Underground Hydronic Piping Above Grade

Physical Address View project details and contacts
City, State (County) Las Vegas, NV 89119   (Clark County)
Category(s) Transportation
Sub-Category(s) Airline/Passenger Terminal
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,586,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Build a piping vault next to the existing utilidor to house the hydronic piping (Chilled Water and Hot Water) being re-routed from below ground to above ground. Support hydronic piping from point of connection in the existing utilidor to the point of new connection. 11/15/2022 01:30:00 PM (PT) Question Cut Off DOA Responses to Q&A and Addenda 11/22/2022 01:30:00 PM (PT) Anticipated Award Date 12/20/2022 01:30:00 PM (PT)

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents