Similar Projects
Savant Office
New Construction
Conception
Bentonville, AR 72712

Canoo Corporate Headquarters
New Construction
Conception
Bentonville, AR

Fox Meadow Subdivision
New Construction, Infrastructure - 35,000 SF
Design
$3,900,000 CJ est. value
Siloam Springs, AR 72761

Metro Business and Space Center
New Construction, Infrastructure - 112,258 SF
Design
$12,100,000 CJ est. value
Rogers, AR 72758

Caliber Collision / Bentonville
New Construction, Infrastructure
Post-Bid
$2,500,000 CJ est. value
Bentonville, AR 72712

Bentonville Public Library Expansion
Addition, Demolition, Renovation, Infrastructure - 59,009 SF
Post-Bid
$12,000,000 CJ est. value
Bentonville, AR 72712

Water Treatment Plant Improvements 4.0 MG Composite Elevated Storage Tank
Infrastructure
Results
$13,141,000 CJ est. value
Rogers, AR 72756

Construction of Latrine Addition at the National Guard Armory
Addition, Demolition, Infrastructure
Results
$555,000 CJ est. value
Siloam Springs, AR 72761

McReynolds Recreational Vehicle Park
New Construction
Construction
Siloam Springs, AR 72761

SW 4th and B Street Townhomes
New Construction, Infrastructure - 10,451 SF
Construction
$2,000,000 CJ est. value
Bentonville, AR 72712

Morning Star Subdivision
New Construction, Infrastructure
Pending Verification
$45,000,000 CJ est. value
Bentonville, AR 72712

Roth Office Building
New Construction - 6,056 SF
Pending Verification
$1,000,000 est. value
Bentonville, AR 72712

8th Street Commercial Buildings
New Construction, Infrastructure
Conception
$5,800,000 CJ est. value
Rogers, AR 72758

Rogers Ped. Impts. (TAP-19) (S)
Infrastructure
Design
$500,000 CJ est. value
Rogers, AR 72756

Hangar Development
Infrastructure
Post-Bid
$590,000 CJ est. value
Bentonville, AR 72712

Last Updated 04/11/2023 03:20 PM
Project Title

Horsebarn Phase 2 - Office Building

Physical Address View project details and contacts
City, State (County) Rogers, AR 72758   (Benton County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Office, Site Development
Contracting Method Bids by Invitation
Project Status Sub-Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $10,200,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

The project is for the construction of a new 3-story office building shell. The building will be able to accomodate multiple future tenants. Tenants are TBD.

Details

3 Stories Above Grade, 48,000 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents