Similar Projects
Water Main Rehabilitation And Replacement - WD25UT01 - City of Napa
Infrastructure
Conception
$400,000 est. value
Napa, CA 94558

Coombs Street Water Main Upgrade Fifth to Ash - WD24UT05 - City of Napa
Infrastructure
Conception
$300,000 est. value
Napa, CA 94559

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Hess Collection Expansion
New Construction, Infrastructure - 217,000 SF
Design
$22,000,000 CJ est. value
American Canyon, CA 94503

Rector Diversion Valve Replacement
Infrastructure
Bidding
$899,600 CJ est. value
Napa, CA 94558

Rector Diversion Valve Replacement
Infrastructure
Bidding
$899,600 CJ est. value
Napa, CA 94558

Parking Lot Sweeping and Pressure Washing and or Steam Cleaning Service
Term Contract
Post-Bid
$50,000 est. value
Napa, CA 94558

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Renovation of the Existing Underground Steam Distribution System
Infrastructure
Results
$13,222,600 est. value
Yountville, CA 94599

Silverado Trail Phase L Paving
Infrastructure
Results
$1,400,000 est. value
Napa, CA 94558

Napa Cove Affordable Apartments
New Construction, Infrastructure
Construction
$36,445,998 CJ est. value
American Canyon, CA 94503

American Canyon Road East Rehabilitation - TR22-0100 - City of American Canyon
Infrastructure
Construction
$200,000 CJ est. value
American Canyon, CA 94503

Castlevale Winery
New Construction, Infrastructure - 21,795 SF
Pending Verification
$2,300,000 CJ est. value
Saint Helena, CA 94574

Element 7 / American Canyon
New Construction, Infrastructure - 7,000 SF
Pending Verification
$2,000,000 CJ est. value
American Canyon, CA 94503

Lincoln Ave Rehabilitation - California To Silverado - City Of Napa
Alteration
Conception
$2,500,000 est. value
Napa, CA 94559

Last Updated 01/17/2023 08:30 AM
Project Title

MT-3023 Measure T Street Rehabilitation at Various Locations

Physical Address View project details and contacts
City, State (County) Yountville, CA 94599   (Napa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $318,967 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 15, 2022, project was awarded to J.V. Lucas Paving, awarded amount is $318,967.30. General Description of Work: The work generally consists of mobilization and demobilization; developing, implementing and maintaining a traffic control system and water pollution control program; cold planing, removing and disposing of existing pavement; placement of hot mix asphalt (HMA); lowering and adjusting utility covers; replacement of traffic striping and pavement markings; installing shoulder backing; cleanup of the project areas, and other items of work as shown in the contract documents.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents