Similar Projects
Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

2022 Pavement Maintenance Project
Infrastructure
Bidding
$1,350,000 est. value
Tiburon, CA

RFP Engineering - Hart Street Connector
Infrastructure
Bidding
$125,000 to $150,000 est. value
Corte Madera, CA 94925

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

CA NPS 2021(1), Pavement Preservation Bay Area
Term Contract
Post-Bid
$2,000,000 to $3,000,000 est. value
Danville, Martinez, Mill Valley, San Francisco, CA 94526

East Blithedale Rehabilitation Project - Phase I
Alteration
Results
$3,000,000 est. value
Mill Valley, CA

Downtown Rehabilitation Project - Phase II
Alteration
Results
$600,000 to $800,000 est. value
Mill Valley, CA

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

2021 Northern Region Road Rehabilitation: Phase 2
Infrastructure
Results
$650,000 est. value
CA

Remove and Replace Bike Path Asphalt and Repaint Existing Bike Path Lines, Arrows and Symbols
Term Contract
Post-Bid
Corte Madera, CA 94925

2021 Redwood Highway Frontage Road Pavement Repair Phase 1
Infrastructure
Results
$350,000 est. value
Mill Valley, CA 94941

Safe Pathways to School, Nevada Street Traffic Calming Project
Infrastructure
Post-Bid
$240,000 to $285,000 est. value
Sausalito, CA 94965

2021 Road Sealant, Phase 2
Infrastructure
Results
CA

Multi-Use Pathway Pavement Maintenance Project
Infrastructure
Results
$190,000 est. value
San Rafael, Sausalito, CA 94965

Last Updated 06/03/2022 02:17 AM
Project Title

Magnolia Avenue Pavement Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Larkspur, CA 94939   (Marin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,930,546 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally consists of mobilization; developing, setup and maintenance of a traffic control system; developing and implementing a water pollution control program; cold planing; removing and disposing of existing pavement, concrete, aggregate base and/or native materials; placement of hot mix asphalt (HMA) and rubberized hot mix asphalt (RHMA) materials; lowering and adjusting to utility covers to finish grade; replacement of traffic striping, pavement markings and raised pavement markers; cleanup of the project area and other items of work as shown in the contract documents.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents