Similar Projects
Pump Station Construction
New Construction
Design
$1,500,000 est. value
Middletown, OH

Valley Springs Wellfield Refurbishment
Infrastructure
Bidding
$1,800,000 CJ est. value
Beavercreek Township, OH 45434

Water Reclamation Facility Secondary Electrical Improvements
Renovation
Sub-Bidding
$200,000 CJ est. value
Middletown, OH 45044

Standby Generator
Term Contract
Sub-Bidding
Saint Clairsville, OH 43950

Facility/ Generator SVC
Post-Bid
$1,500 est. value
Columbus, OH 43206

Heritage Park Gazebo Electrification
Alteration
Post-Bid
Columbus, OH

Vanhyning Pumping Station Replacement Project
Results
$2,500,000 est. value
Napoleon, OH 43545

Bent Tree Pump Station Replacement
New Construction
Results
Strongsville, OH

Booster Station Replacement - Portersville East Branch Water
Construction
$270,000 est. value
Malta, OH 43758

Industrial Corridor Pump Station and Force Main
New Construction
Construction
Ironton, OH 45638

Parks Secondary and Tertiary Signage
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Toledo, OH 43606

Mahoning Valley Campus of Care Campus Wide Minor Lighting Fixture Replacement
Alteration
Post-Bid
Mineral Ridge, OH 44440

Water Line Replacement and Booster Stations Upgrades
Results
$720,000 est. value
Pomeroy, OH

Automated Door Entry System
Renovation
Sub-Bidding
$10,000 CJ est. value
Newark, OH 43055

CSC-21501 Maintenance of HVAC, Plumbing and Emergency Power Supply (EPS) Systems
Term Contract
Post-Bid
Whitehall, OH 43213

Last Updated 08/11/2022 03:33 PM
Project Title

Lift Station 39 Generator Improvements - Rebid

Physical Address View project details and contacts
City, State (County) Mansfield, OH 44903   (Richland County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Electric, Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $101,145 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

39 Lift Station Generator Improvements. Question Deadline 07/08/2022 at 10:30 AM ET - Direct Questions about the project to theodore bennett, P.E at Jones & Henry Engineering, Ltd. at 3103 Executive parkway, suite 300, toledo, oh 43606, tbennett@jheng.com. Contract time - 470 days

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Packaged Generator Assemblies.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents