Similar Projects
2021 Mill and Overlay
Infrastructure
Bidding
Englewood, CO

Statewide Asphalt
Post-Bid

2020 Slurry Seal
Post-Bid
Englewood, CO 80110

CO CRVFO Roads & Construction IDR 2020
Results
$25,000 to $150,000 est. value

CO LSFO Roads & Construction IDR 2020
Results
$25,000 to $40,000 est. value

Indefinite Quantity (Idiq) Multiple Award Construction Contract (Macc) For Paving Projects At Various Government Installations Within The Navfac Sw Area Of Responsibility Including But Not Limited To California, Arizona, Nevada, Utah, Colorado, And New Mex
Post-Bid

CO KFO Roads & Construction IDR 2020
Results
$25,000 to $170,000 est. value

2020 Roadway Improvements Project
Post-Bid
Bow Mar, CO 80123

2020 Contract Milling Program
Term Contract
Results
Littleton, CO 80120

2020 Mill and Overlay Project
Post-Bid
Englewood, CO

2020 Concrete Removal and Replacement
Results
Cherry Hills Village, CO 80113

2020 Mineral Drive Intersection and Mill and Overlay Project
Post-Bid
Littleton, CO 80120

2020 Surface Sealing Project
Results
Less than $200,000 est. value
Littleton, CO 80210

2020 Santa Fe and Union Concrete Pavement Reconstruction
Post-Bid
Englewood, CO

2020 Chip Seal
Results
Less than $500,000 est. value
Cherry Hills Village, CO 80113

Reported 07/14/2021 12:00 AM
Project Title

Hot Mix Asphalt Fci Englewood

Physical Address View project details and contacts
City, State (County) Englewood, CO   (Arapahoe County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Bureau of Prisons has a future requirement for the supplies to repair asphalt at Federal Correctional Institution (FCI) Englewood. The requirement consists of four thousand four hundred (4400) tons of hot mix asphalt. Delivery/Trucking shall be the responsibility of FCI Englewood. Hot Mix Asphalt - The hot mix asphalt design shall be ½” (SX-75 W/20% RAP{64-22}) Hot Mix Asphalt. The Asphalt shall leave the plant with a temperature between 290-320 degrees. Therefore the asphalt plant location shall be located within a 30-40 minute delivery area and must be capable of supplying up to 200 tons per hour. Application of the asphalt will be completed using equipment and labor provided by the FBOP (Federal Bureau of Prisons).

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents