Similar Projects
Buckeye North Library and Community Center
New Construction
Conception
Buckeye, AZ 85326

Tempe Campus University Athletic Track and Field Facilities
New Construction
Conception
Tempe, AZ 85281

30 Acre Community Park North Zone
New Construction
Design
$2,465,340 est. value
Buckeye, AZ

Buckeye Pool & Parking Expansion
New Construction - 19,000 SF
Design
$1,450,000 est. value
Buckeye, AZ 85326

Durango Campus Landscape and Water Conservation Retrofit
Infrastructure, Renovation
Bidding
Phoenix, AZ 85009

Durango Campus Landscape and Water Conservation Retrofit
Infrastructure, Renovation
Bidding
Phoenix, AZ 85009

City of Glendale (Various Locations)
Infrastructure
Sub-Bidding
$2,786,866 CJ est. value
Glendale, AZ 85301

Fencing Replacement and Repair
Infrastructure
Sub-Bidding
$50,000 CJ est. value
Peoria, AZ 85345

American Disabilities Act Project Upgrades - Phase II
Post-Bid
$500,000 to $750,000 est. value
Chandler, AZ

Mack Supplier Infrastructure Project
Infrastructure
Post-Bid
Phoenix, AZ 85085

Lehi Crossing Shared Use Pathway - Phase 1
Results
Mesa, AZ

The Paseo
Results
Gilbert, AZ 85296

5290 East Exeter Subdivision
New Construction
Construction
Phoenix, AZ 85018

Bungalows on Westgate - Glendale
New Construction, Infrastructure
Construction
Glendale, AZ 85305

Fitness Center
New Construction, Demolition - 20,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Mesa, AZ

Last Updated 07/28/2022 07:32 PM
Project Title

Weight Room Slab Repair - Marcos De Niza

Physical Address View project details and contacts
City, State (County) Tempe, AZ 85283   (Maricopa County)
Category(s) Entertainment/Recreation, Heavy and Highway, Single Trades
Sub-Category(s) Athletic Facility, Concrete, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022,
Bids Due View project details and contacts
Estimated Value $23,532 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Questions Due Date: Jun 22nd 2022, 5:00 PM MST Weight room slab repair along with proper disposal of all debris. Location: 6000 S. Lakeshore Drive, Tempe, Arizona 85283 Tempe Union High School District - Purchasing Department is soliciting formal quotes from all qualified Contractors to provide all necessary equipment, labor, apparatues and material to perform weight room slab repair along with proper disposal of all debris at 6000 S. Lakeshore Drive, Tempe, Arizona 85283. The successful Contractor must provide the following services: 4.1. The Contractor shall be responsible for all equipment, parts, materials, apparatues and all things necessary to complete this project; 4.2. Responsible for removal and disposal of all debris and unused parts, materials and equipment; 4.3. Saw cut the deteriorated concrete slab on grade according to repair plan S3.0; 4.4. Remove the concrete (properly disposed of all concrete); 4.5. Remove four (4") inches of soil and replace with ABC material per original soil report; 4.6. Material and Compaction per soil report; 4.7. Install epoxy dowels in the existing slab (per detail 1 & 2/S3.0.) 4.8. Replace new concrete as specified in General Structural Notes (GSN); 4.9. The pricing sheets indicate only probable items intended for procurement. Tempe Union High School District reserves the right to limit the procurement only to the items actually required during the award period; and 4.10. All materials and supplies requested by the Department must be of professional-grade, commercial quality/support along with all any warranty information. 4.11. Special instructions: The Contractor shall confine operations at the site to areas permitted by law, ordinances, permits and the Contract Documents, and shall not unreasonably encumber the site with any materials or equipment. The existing facility will be occupied Monday through Friday from 7AM to 3PM. No work to occur during those days and hours. Contractor must work evenings, nights and weekends to complete the scope of work; and The Contractor will have the option to work during school hours if they can prove that it will disrupt the operation of school and compromise life safety. The District/Owner will still have the final decision regarding if the Contractor can work or not work during school hours. This procurement is from issuance of notice to proceed for sixty (60) days.

Details

Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Earth Moving, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents