Similar Projects
Canyon Pines Infrastructure Project
Infrastructure
Bidding
Golden, CO

Detention Pond Improvements
Post-Bid
Golden, CO

Bridge Abutment Foundation Repair
Post-Bid
Lakewood, CO 80228

Removal of Asphalt Mat Ditch Grading, Placement of Topsoil and Seeding
Results
$1,000,000 to $5,000,000 est. value
CO

Drainage Improvements and Repaving of Zang Street and Coal Creek Yards
Results
$1,000,000 to $5,000,000 est. value
CO

Grading Erosion and Sediment Control GESC Services
Post-Bid
Lakewood, CO 80227

Sky Ranch Phase 2 Grading Project
Results
Lakewood, CO 80033

Addenbrooke Park Pond and Irrigation Renovation
Infrastructure, Alteration
Post-Bid
Lakewood, CO 80215

Spray Lining 4 Culverts and Constructing a Headwall and Wingwall for One Culvert
Results
Less than $1,000,000 est. value

Removing and Replacing All Existing Tunnel Lighting
Results
$5,000,000 to $20,000,000 est. value

Addenbrooke Park Pond Renovations
Results
Lakewood, CO

Bayou Ditch Culvert Replacement
Results
$70,000 to $90,000 est. value
Wheat Ridge, CO 80033

Flood Mitigation and Repair for Monument POE North Bound
Results
Less than $36,000 est. value
Lakewood, CO

Pipe Stockpile Tarp
Results
Arvada, CO 80002

Us 285 Sinkhole/Culvert Repair
Results
CO

Reported 07/01/2021 12:00 AM
Project Title

Handrail Improvements at Maverick Mesa Park

Physical Address View project details and contacts
City, State (County) Arvada, CO   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The issue is with the handrail on top of the culvert headwall, which measures less than two feet. The drop down below is approximately 12 feet. The handrail that extends down the sides of the culvert (wingwalls) is the same height, but because the elevation slopes down, the height of the walls + handrail increases.

Details

Division 10 - Specialties, Wall and Door Protection, Bumper Guards, Protective Corridor Handrails.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents