Similar Projects
Full Service Maintenance Contract for Carrier Equipment
Term Contract
Bidding
College Park, MD 20742

HVAC Maintenance and Repair at Cheltenham Youth Center
Post-Bid
Cheltenham, MD 20623

NMIC-1 Replace 4 Chillers and Controls/Install Chiller Catwalks Project, National Maritime Intelligence Center, Suitland, Maryland
Post-Bid
$10,000,000 to $25,000,000 est. value
Suitland, MD

Portable Air Conditioning Preventative Maintenance and Repairs
Results
Berwyn Heights, MD 20740

Glassmanor Elementary School - Building Envelope and Central HVAC Conversion
Results
$3,000,000 est. value
Upper Marlboro, MD 20745

RGH Air Condition Unit Replacement
Post-Bid
Laurel, MD 20707

J.E. Proctor Building Chiller Replacement
Results
Bowie, MD 20715

HVAC Preventative Maintenance and Service
Post-Bid

Croom High School HVAC Modernization
Results
Less than $1,700,000 est. value
Cheltenham, MD 20623

Dust Collection Unit
Post-Bid
Andrews Air Force Base, MD 20762

Thurgood Marshall Library Cooling Tower Replacement
Results
Bowie, MD 20715

BARC MCquay Range #2 Chiller
Post-Bid
Beltsville, MD 20705

Recommissioning (ReCx) Repairs Building: BARC 052 Controls
Results
$25,000 to $100,000 est. value
Beltsville, MD 20705

HVAC System Replacement for the 6000- Series
Post-Bid
Greenbelt, MD 20770

BARC - Overhaul Building 010A Chiller #2
Results
Beltsville, MD 20705

Reported 11/21/2020 12:00 AM
Project Title

Water Treatment Service Contract

Physical Address View project details and contacts
City, State (County) College Park, MD 20742   (Prince Georges County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) HVAC, Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The University is seeking services of a Vendor that can provide a complete full service water treatment program. The water treatment program will include cooling towers, heating water loops, chilled water loops, boiler systems, a thermal ice storage tank, glycol loops (ethylene and polypropylene) and process water loops. The water treatment program shall include all chemical products, any required equipment. The contractor shall provide professional consulting, training and resources to University employees to enable the successful outcomes desired by the program.

Details

Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents