Similar Projects
Miami Freedom Park & Soccer Village
New Construction - 1,000,000 SF
Conception
$1,000,000,000 est. value
Miami, FL

Camping World Stadium (CWS) Improvements
Design
Less than $47,000,000 est. value
Orlando, FL 32805

Community Field And Stadium For Edward Waters College
New Construction
Construction
$4,300,000 est. value
Jacksonville, FL 32099

Fenway Park South (Jetblue) Stadium Repairs
Post-Bid
Fort Myers, FL 33913

Ben Hill Griffin Stadium Facility Upgrades
Results
Gainesville, FL 32611

AG Center Main Show Arena Repairs
Results
Marianna, FL 32446

J.M. Tate High School Stadium Repairs
Post-Bid
Less than $200,000 est. value
Cantonment, FL 32533

Tommy Roberts Memorial Stadium Design/Build
Renovation
Bidding
$15,000,000 est. value
Key West, FL 33040

Amway Center Orlando Experience Project
New Construction
Bidding
$500,000 est. value
Orlando, FL 32801

Springstead High School Bleacher Renovation and Press Box Replacement
Bidding
$1,125,000 est. value
Spring Hill, FL 34609

Florida State University Football Stadium
Renovation
Conception
Tallahassee, FL 32304

Last Updated 08/05/2020 12:00 AM
Project Title

Roger Dean Chevrolet Stadium - Batting Tunnel

Physical Address View project details and contacts
City, State (County) Jupiter, FL 33458   (Palm Beach County)
Category(s) Entertainment/Recreation
Sub-Category(s) Stadium
Contracting Method
Project Status Construction Commenced November 2019, Construction Complete as of June 2020
Bids Due View project details and contacts
Estimated Value $1,552,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project to include the construction of a 9,360 sf covered batting tunnel building in place of an existing outdoor batting cage, including reconfiguration of adjacent pitching mounds and other ancillary site improvements adjacent to the proposed structure, including minor signage additions to the approved sign program at the existing Roger Dean Chevrolet Stadium.

Details

1 Stadium, 1 Story Above Grade, 9,360 SF Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 10 - Specialties, Signage.
Division 13 - Special Construction, Fabricated Engineered Structures, Metal Building Systems.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents