Similar Projects
Last Updated | 08/20/2019 10:52 AM |
Project Title | Inner Harbor Dredging Reaches A & B Stations 70+000 to 103+000, Savannah, GA |
Physical Address | View project details and contacts |
City, State (County) | Savannah, GA - Hardeeville, SC (Chatham (GA) - Jasper (SC) County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dredging |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $100,000,000 to $250,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Savannah Harbor Expansion - Inner Harbor Dredging Reaches A & B Stations 70+000 to 103+000: project includes removal of all material, including any material within the existing maintenance prism, to required project depths and overdepths. Dredging of maintenance and unclassified material between Stations 70+000 to 103+000 and Kings Island Turning Basin, debris removal, and diving shall be included in the contract. All dredged material will be disposed of in existing confined upland disposal areas. Hopper dredging is not allowed for this work. Work will not be allowed above Station 63+360 in the harbor from approximately April 1 to May 15 to avoid impacts to striped bass fishery resources. The material to be removed includes new work materials and overlying maintenance materials. O&M material quantities are subject to change with O&M cycles, but approximately 1,200,000 cubic yards of maintenance material will be removed along with new work material. Materials may vary substantially both vertically and horizontally. Two feet of paid overdepth will be allowed. The contractor shall not disturb -3.0 feet beyond the maximum pay depth. Disposal of all materials from the inner harbor will be in the existing confined upland Dredge Material Containment Areas (DMCA) designated as 13A (and 12A, if available after dike raising). The maximum pumping distance to these areas is approximately 43,000 feet. The contractor will be responsible for proper operation and maintenance of the disposal areas during dredging operations. Approximately 4,000,000 cubic yards of unclassified material with be placed along with the maintenance material. | ||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |