Similar Projects
Northwest Water Reclamation Facility Blowers and Sludge Pump Replacement and System Improvements
Infrastructure
Bidding
$3,262,076 est. value
Apopka, FL 32703

Annual Water Well Maintenance and Repair
Term Contract, Infrastructure
Bidding
FL

Unit 5 52 Circulating Water Pump Overhaul at Mcintosh Power Plant
Post-Bid
Lakeland, FL 33805

Wells and Pressure Tank Purchase and Installation Services
Post-Bid
Fort Pierce, FL 34945

Replace Chiller and Pumps at USCG Sector Key West, Florida
Results
$250,000 to $500,000 est. value
Big Coppitt Key, FL 33040

New Well 16 Construction and Well 11 Abandonment
Results
Jacksonville Beach, FL 32227

Military Point Advanced Wastewater Treatment Facility Pumps and Motors Replacement Project
Alteration
Bidding
$500,000 est. value
Panama City, FL 32403

Electric Motor Repair
Post-Bid
Cape Coral, FL 33915

Repair Services for Pumps, Motors, and Other Equipment
Results
Kissimmee, FL 34741

Well and Septic Tank Phase Out Program
New Construction, Infrastructure
Bidding
FL

Annual Agreement For Wastewater Pump Station Repair And Renovation
Term Contract
Post-Bid
FL

Raw Water Well #9
Results
Hallandale, FL 33009

Econfina Creek Raw Water Pump Station Third Pump Addition
Infrastructure
Bidding
Youngstown, FL 32466

SHIP Program Well and Septic Installation
Post-Bid
Macclenny, FL 32063

Saratoga Springs Plant Site Well Construction
Results
Green Cove Springs, FL

Last Updated 01/10/2022 09:21 AM
Project Title

Potable Water Supply Test Well

Physical Address View project details and contacts
City, State (County) Arcadia, FL   (DeSoto County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $247,800
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Potable Water Supply Test Well which consists of drilling a new test well that can later be converted to production well to an estimated depth of 350 feet and performing associated testing including step drawdown test and 72-hour constant rate test.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents