Similar Projects
Hawthorn MS North Boiler Replacement
Bidding
Vernon Hills, IL 60061

Fairmount ES Mechanical Upgrades
Bidding
Downers Grove, IL 60516

East Moline Correctional Center Boiler Acid Wash
Post-Bid
East Moline, IL 61244

Boiler and Hot Water Heater Maintenance
Term Contract
Post-Bid
Downers Grove, IL

Niles West Domestic Water Heater Replacement
Renovation
Results
Skokie, IL 60077

Building B Boiler Replacement Service
Results
Crystal Lake, IL 60012

2021 Fire Alarm System, Boiler Upgrades and Freezer Replacement
Bidding
Loves Park, Machesney Park, IL 61115

Abandoned Rooftop Equipment Removal
Post-Bid
Palatine, IL 60067

Water Heater Replacement
Results
Deerfield, IL 60015

FDC Mechanical Systems/Envelope Upgrades
Bidding
University Park, IL

Repair Boilers
Post-Bid
$100,000 to $250,000 est. value
IL

Water Treatment Plant Boiler Replacement
Results
Hudson, IL 61748

Fenton HS Ionization Existing Mechanical Equipment
Bidding
Bensenville, IL 60106

DHS/Elgin MHC Refrigeration
Term Contract
Post-Bid
Elgin, IL 60123

Boiler Replacement at Dawes Elementary School Annex Building and Washington Elementary School Annex Building
Results
Evanston, IL 60202

Last Updated 12/29/2020 08:35 AM
Project Title

Jail Domestic Hot Water Heater Replacement

Physical Address View project details and contacts
City, State (County) Woodstock, IL 60098   (McHenry County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes, but is not limited to, the following: Replacement of the Government Center hot water heaters Replacement of the Government Center tempered water return pump Replacement of the Government Center hot water return pump Replacement of the Government Center hot water heater temperature controls Replacement of the Government Center thermostatic mixing valve Modification of domestic hot water piping for new domestic hot water heaters Modification of hot water heater flue piping

Details

Division 01 - General Requirements.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Electric Domestic Water Heaters.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents