Similar Projects
Main Street Overlay From 6th Avenue to 8th Avenue - City of Edmonds
Infrastructure
Conception
$937,000 CJ est. value
Edmonds, WA 98020

Main Street Overlay From 6th Avenue to 8th Avenue - City of Edmonds
Infrastructure
Conception
$937,000 CJ est. value
Edmonds, WA 98020

I-405/SR 522 to SR 527 - Widening and Express Toll Lane
Infrastructure
Design
$510,000,000 CJ est. value
Bothell, WA 98012

I-405/SR 522 to SR 527 - Widening and Express Toll Lane
Infrastructure
Design
$510,000,000 CJ est. value
Bothell, WA 98012

Lake Ballinger Ecosystem Restoration
Infrastructure
Bidding
$10,000,000 CJ est. value
Mountlake Terrace, WA 98043

Lake Ballinger Ecosystem Restoration
Infrastructure
Bidding
$10,000,000 CJ est. value
Mountlake Terrace, WA 98043

Residential Treatment Facility North - Phase 1
New Construction, Infrastructure - 16,000 SF
Sub-Bidding
$2,000,000 CJ est. value
Stanwood, WA 98292

Tower Site Readiness Phase II Project
Infrastructure
Post-Bid
Camano Island, Darrington, Everett, Kingston, Marysville, Mountlake Terrace, WA 98208

8th Street Improvements Project
Alteration
Post-Bid
$739,767 est. value
Marysville, WA

Harbour Reach Drive Improvements
Infrastructure
Results
$915,224 est. value
Mukilteo, WA 98275

Fisherman's Harbor Commercial Development Parcels A8 & A17
New Construction, Infrastructure, Alteration - 6,000 SF
Results
$4,300,000 to $4,700,000 est. value
Everett, WA 98213

Northwest Washington Rehab Hospital
New Construction, Infrastructure - 52,500 SF
Pending Verification
$15,000,000 CJ est. value
Lynnwood, WA 98087

Northwest Washington Rehab Hospital
New Construction, Infrastructure - 52,500 SF
Pending Verification
$15,000,000 CJ est. value
Lynnwood, WA 98087

SR 524/Olympic Ave Vic To 48th Ave W Vic - ADA Compliance
Infrastructure
Design
$2,296,000 CJ est. value
Snohomish, WA 98296

Mariner High School Renovation and Addition - Sub Bid
Addition, Demolition, Renovation, Infrastructure
Bidding
$17,000,000 CJ est. value
Everett, WA 98204

Last Updated 11/17/2022 04:36 PM
Project Title

270th Street NW Self Storage Facility

Physical Address View project details and contacts
City, State (County) Stanwood, WA 98292   (Snohomish County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Site Development, Warehouse/Storage
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located on 3.4 acres. Scope details have not been released. As of November 17, 2022 the project is in planning stage. Civil drawings have not yet been submitted to the City of Stanwood. Information regarding the architect, general contractor and method of selection has not been disclosed. The construction timeline has not been determined, but is not expected to begin before the summer of 2023.* *Absolutely no inquiries will be accepted by the owner at this time. Unsolicited inquiries may result in disqualification in any future bidding opportunities.

Details

1 Story Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents