Similar Projects
F22 Consolidated Operations and Maintenance Hangar (COMH), Langley AFB
New Construction
Bidding
$25,000,000 to $100,000,000 est. value
Hampton, VA 23631

Ramp and Interchange Improvements
Infrastructure
Bidding
$765,000 est. value
Norton, VA

Sidewalk Repair - Edinburg Residency
Term Contract
Post-Bid

Sidewalk Repair - Edinburg Residency
Term Contract
Post-Bid

HSIP Pedestrian Improvements at Signalized Intersections Phase 1B
Results
Richmond, VA 23221

HSIP Pedestrian Improvements at Signalized Intersections Phase 1B
Results
Richmond, VA 23221

Smith Mountain Lake Airport
New Construction, Addition - 89,300 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Moneta, VA 24121

Alars Auto Sales
Renovation
Construction
Roanoke, VA 24012

Belvidere Street Gateway Phase IV Signal, Crosswalk and Sidewalk Improvements
Infrastructure
Bidding
Less than $718,000 est. value
Richmond, VA

Y1PZ--Expand Parking Lot T
Post-Bid
$500,000 to $1,000,000 est. value
Salem, VA 24153

TAP Sidewalk Improvements
Results
Culpeper, VA 22701

New River Valley Airport Hangar Site Construction
New Construction, Infrastructure, Alteration
Bidding
$450,000 est. value
Dublin, VA 24084

Churchland Academy Parking Lot
Post-Bid
Portsmouth, VA 23703

Granby Street Bike Bypass at Riverview
Results
Norfolk, VA

Verona Pedestrian Improvements
Infrastructure
Bidding
Less than $1,247,000 est. value
Verona, VA

Reported 04/21/2022 12:00 AM
Project Title

Mecklenburg-Brunswick Regional Airport - Construct Helicopter Parking and Hangar Taxilanes (21022)

Physical Address View project details and contacts
City, State (County) Brodnax, VA 23920   (Mecklenburg County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Aircraft Hangar, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves the installation of a single helicopter parking apron and the sitework and construction of two box hangars and associated taxilane pavement. Embankment for the hangars and taxilane will be constructed from an existing soil stockpile at the airport. The project also involves clearing, grubbing, and re-grading an existing stormwater management basin at the south side of the airport. Construction will be multi-phased and the first notice to proceed is anticipated in Fall of 2022.

Details

Aircraft Hangar, New Construction.
Division 03 - Concrete, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 13 - Special Construction, Fabricated Engineered Structures, Metal Building Systems.
Division 21 - Fire Suppression.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents