Similar Projects
US 101/Schaerer Creek to Hood Canal - Remove Fish Barrier
Infrastructure
Conception
$2,661,000 CJ est. value
Cosmopolis, WA 98537

SR 105/S of Fairmount Ave - Culvert Replacement
Infrastructure
Conception
$2,945,000 CJ est. value
Aberdeen, WA 98520

US 12/Satsop River Bridge EB - Bridge Painting
Renovation, Infrastructure
Design
$4,410,000 CJ est. value
Aberdeen, WA 98520

US 101/Chicken Coop Creek - Remove Fish Barrier
Infrastructure
Design
$2,472,000 CJ est. value
Cosmopolis, WA 98537

RFQ - Systemic Pedestrian Safety Improvements
Term Contract
Bidding
Aberdeen, WA 98520

RFQ - Systemic Pedestrian Safety Improvements
Term Contract
Bidding
Aberdeen, WA 98520

East Pioneer Improvements Academy to Glenn
Infrastructure
Post-Bid
Montesano, WA 98563

Greenwood Tie
Infrastructure
Post-Bid
WA

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

Miller Junior High School Site Preparation for Covered Area
Infrastructure
Results
Aberdeen, WA 98520

Satsop Haul Road Emergency Erosion Protection
Infrastructure
Construction
$305,312 CJ est. value
Aberdeen, WA 98520

SR 109/N of Moclips Highway - Stabilize Slope
Infrastructure
Design
$1,824,000 CJ est. value
Hoquiam, WA 98550

Airfield Pavement Maintenance
Term Contract
Post-Bid
Hoquiam, Quincy, WA 98550

Downtown Aberdeen Revitalization Traffic Improvements
Infrastructure
Results
$1,200,000 to $1,500,000 est. value
Aberdeen, WA 98520

SR 105/W Harriman St Signal - Roundabout
Infrastructure
Design
$1,000,000 CJ est. value
Aberdeen, WA 98520

Last Updated 04/23/2023 02:02 AM
Project Title

Development Site Water Main and Sidewalks

Physical Address View project details and contacts
City, State (County) Montesano, WA 98563   (Grays Harbor County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $470,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes all labor, materials and equipment to install approximately 1,000 linear feet of cement concrete sidewalk, 600 feet of curb and gutter, installation of Hot Mix Asphalt pavement patching, clearing and grubbing, saw cutting, removal of sections of asphalt roadway and concrete driveways, subgrade preparation and roadside restoration. Related utility work includes installation of approximately 900-feet of 6-inch C900 PVC water main including valves, fittings and appurtenances; and installation of approximately 200 feet of storm drain pipe and related catch basins. An award of contract is anticipated to be made within 30 days of bid opening Technical inquiries regarding the project should be directed to Mike Olden, P.E., at the City of Montesano, via email only at molden@montesano.us. A pre-bid conference will not be held. Est. Completion Date: July 7, 2023 Pre-Bid Meeting Info: No Prebid Meeting

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents