Similar Projects
Goshen Junior High School - Boiler and Pump Replacement
Renovation
Sub-Bidding
$200,000 CJ est. value
Goshen, IN 46526

Plumbing Services at the James Hunter Building
Alteration
Post-Bid
East Chicago, IN 46312

Plumbing, Mechanical, Electrical Work for the New Mt. Vernon Elementary School
Alteration
Post-Bid
Fortville, IN

Huntertown Elementary School Plumbing
Alteration
Results
$215,000 est. value
Huntertown, IN 46748

Plumbing Repair
Alteration
Results
Nashville, IN

Park Road and 200 West Water Main
Infrastructure
Construction
$371,319 CJ est. value
Greensburg, IN 47240

Fawn River Crossing - Water Tower Coating System
Renovation
Post-Bid
$430,000 CJ est. value
Lagrange, IN 46761

Mount Vernon Transportation Center MEP
Alteration
Results
IN

Hegewisch Burnham Diamonds
Term Contract
Post-Bid
South Bend, IN 46601

Rehabilitation and Repainting of the Dubois Co. 4-H/Park Existing 200,000 Gallon Elevated Water Storage Tank
Infrastructure
Results
$135,200 CJ est. value
Saint Anthony, IN 47575

Levan Scott Academy Bid Phase 2: Architectural and MEP
Alteration
Post-Bid
$1,600,000 est. value
Fort Wayne, IN 46806

Wastewater System Improvements Division II - Repainting of Wastewater Treatment Plant Clarifiers and Miscellaneous Equipment - Rebid
Renovation
Results
$149,022 CJ est. value
Dale, IN 47523

On Call Plumbing Repairs
Term Contract
Post-Bid
Evansville, IN 47710

Water System Improvements Division II - Distribution Main Reinforcements Washington Township Water Corporation
Infrastructure
Results
$132,520 CJ est. value
New Washington, IN 47162

Indianapolis Public Schools Building 56 Plumbing
Renovation
Post-Bid
$300,000 CJ est. value
Indianapolis, IN 46204

Last Updated 04/27/2023 01:40 PM
Project Title

Waterworks Improvements New Water Supply Well, Water Treatment Plant Modifications, & SCADA

Physical Address View project details and contacts
City, State (County) Saint Paul, IN 47272   (Decatur County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $210,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes construction of a replacement well, rehabilitation of the existing water treatment building and replacement of certain SCADA system components. DIVISION I - NEW WATER SUPPLY WELL, WATER TREATMENT PLANT MODIFICATIONS & SCADA The Project includes construction of a replacement well, rehabilitation of the existing water treatment building and replacement of certain SCADA system components. DIVISION II - WATER METER REPLACEMENT The Project includes replacement of approximately 391 residential water meters. Contractor shall provide and install new water meter, encoder and endpoint for complete replacement of existing equipment. This project shall include water meter reading equipment and software with billing system integration and training. This project additionally includes replacement of scattered water main valves and hydrants in the St. Paul water distribution system. DIVISION III - WATER STORAGE TANK REHABILITATION The Project includes complete interior and exterior paint coatings for the existing 100,000 gallon elevated water storage tank. This project also includes demolition of St. Paul's existing 60,000 gallon elevated water storage tank. The contract work provides for furnishing all materials, labor, and equipment as required Construction of a new Well No. 3, blasting and painting of the iron removal unit exterior, piping, pumps, valve & fittings, chlorine analyzer, insulation of the iron removal unit in the attic space, removal, and replacement of the entire ceiling in the pump room along with new attic insulation. Project also includes replacement of light fixtures in the pump room, replacement of the iron removal control panel with a new SCADA panel at the WTP and water storage tank. SCADA shall control the start and stop of wells, iron removal unit blower, and start and stop of high service pumps based on the elevated water storage tank level. Components also include site piping, site improvements, electrical as necessary for a complete and operational facility

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents