Similar Projects
Detention Facility IDEC Units Replacement (8) Pods 3 and 6 - Arapahoe County
Renovation
Conception
$600,000 CJ est. value
Centennial, CO 80112

SHF - Detention Facility - Perimeter Fencing - Adams County
Infrastructure
Conception
$250,000 CJ est. value
Brighton, CO 80601

Basketball Court Replacement
Renovation
Design
$200,000 CJ est. value
Pueblo, CO 81003

Arapahoe County Justice Center - Kitchen and Laundry Room Expansion
Addition, Renovation
Design
$5,000,000 CJ est. value
Centennial, CO 80112

RFQ Contractor - General Contracting Construction Services - Alternative Sentencing, Central Plant & Jail Intake - Rebid
Addition, Demolition, Infrastructure
Bidding
$600,000 CJ est. value
Boulder, CO 80301

Construction Manager at Risk Services for New Jail Construction
New Construction - 182,000 SF
Post-Bid
CO

Detention Facility Rolling Fire Doors
Renovation
Post-Bid
$394,000 est. value
Brighton, CO 80601

Design and Construction of New Detention Facility
Renovation - 181,918 SF
Results
Less than $95,000,000 est. value
CO

CTF INXX P050881 SCC Interior Repairs GC Agmt
Alteration
Results
$47,500 est. value
Canon City, CO

Mesa County Detention Facility Pod and Yard Renovations
Renovation
Construction
Grand Junction, CO 81501

Detention Facility Access Road Paving and C&G Replacement - Arapahoe County
Infrastructure, Renovation
Conception
$810,000 CJ est. value
Centennial, CO 80112

Criminal Justice Center Video Visitation Remodel
Renovation
Post-Bid
Colorado Springs, CO 80906

Evidence Incinerator System
Renovation
Results
Colorado Springs, CO 80906

Montrose County Jail - Booking and Kitchen Renovation
Renovation
Post-Bid
$396,650 CJ est. value
Montrose, CO 81401

CM/GC Services Medical/Mental Health Expansion of the AC Detention Facility
Addition
Results
Centennial, CO 80112

Last Updated 02/22/2023 06:04 AM
Project Title

SCF Steam Condensate Line Replacement

Physical Address View project details and contacts
City, State (County) Sterling, CO 80751   (Logan County)
Category(s) Government/Public
Sub-Category(s) Prison/Jail
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $6,830,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: Provide a new direct buried high-pressure steam and condensate distribution piping to replace the existing failing piping as depicted and described in the contract documents. The new distribution piping will be installed parallel to the existing and each building will be transitioned to the new system once the new system is operational to reduce downtime. Date Email Questions Due February 10, 2023 @ 1600 Bid Bond: 5%

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents