Similar Projects
Rehabilitation Taxiway B - City of La Crosse
Renovation, Infrastructure
Conception
$2,650,000 est. value
La Crosse, WI 54603

17th Place South From Main Street to Cass Street - 160 - City of La Crosse
Infrastructure
Conception
$1,407,200 CJ est. value
La Crosse, WI 54601

Hamilton Public Works and Hall
Infrastructure
Design
$4,845,000 CJ est. value
West Salem, WI 54669

Hamilton Public Works and Hall
Infrastructure
Design
$4,845,000 CJ est. value
West Salem, WI 54669

Elm Street, Street and Storm Sewer Upgrades
Infrastructure
Bidding
$500,000 CJ est. value
West Salem, WI 54669

Elm Street, Street and Storm Sewer Upgrades
Infrastructure
Bidding
$500,000 CJ est. value
West Salem, WI 54669

2021 Curb and Gutter with Utilities
Post-Bid
La Crosse, WI 54603

Cole Court Utility Extension
Infrastructure
Post-Bid
Holmen, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Cold In-Place Recycled Asphalt Pavement
Results
West Salem, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Erickson Park Renovations - City of La Crosse
Infrastructure
Conception
$270,000 CJ est. value
La Crosse, WI 54601

2022 Sewer Rehabilitation
Infrastructure
Design
$620,000 CJ est. value
Campbell, WI 54603

Old Highway 93 Sanitary Sewer and Water Main
Infrastructure
Bidding
$500,000 CJ est. value
Holland, WI 54636

Last Updated 09/14/2022 09:07 AM
Project Title

Bliss Road Slope Repair and Stabilization - 649 - City of La Crosse

Physical Address View project details and contacts
City, State (County) La Crosse, WI 54601   (La Crosse County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2024
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Stabilize the hillside of Bliss Road, there is an erosion problem sloughing areas of the hillside onto the golf course. A study was completed in 2020 identifying the problem areas of the hillside that need to be stabilized. As of September 14, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents