Similar Projects
Raised Pavement Markings Refurbished
Infrastructure
Bidding
$714,989 est. value

Raised Pavement Markings Refurbished
Infrastructure
Bidding
$714,989 est. value

South Parking Lot and Entrance Lane Sealcoating
Post-Bid
Indianapolis, IN 46200

Morrison TIF Sidewalk Improvements Phase II
Post-Bid
Muncie, IN

Northrop High School West Site Improvement
Results
Fort Wayne, IN 46800

Hessen Cassel Storm and Sidewalk Improvements
Results
Fort Wayne, IN 46800

Burns Harbor Marquette Trail Phase 2
Infrastructure
Bidding
$80,000 est. value
Burns Harbor, IN

Hamilton Southeastern HS South Parking Lot Reconstruction
Post-Bid
Fishers, IN 46037

Continuous Diamond Grinding
Results
Fishers, IN

Zionsville Big-4 Rail Trail Widening and Extension
Infrastructure
Bidding
$200,000 est. value
Zionsville, IN

Miscellaneous Repair to Curb, Curb and Gutter, Handicap Ramps and other Concrete Flatwork
Post-Bid
Terre Haute, IN 47803

Roosevelt Park Boardwalk Improvements
Results
Fort Wayne, IN 46808

Hardscape Improvements Project at Multiple Sites
Infrastructure
Bidding
$900,000 est. value
Franklin, IN

Mulberry Street Sidewalk and Curb Replacement
Post-Bid
Kokomo, IN 46902

Bluffton Road Sidewalks Phase 1
Results
Fort Wayne, IN

Last Updated 05/27/2022 03:28 PM
Project Title

Silver Creek Kayak Launch

Physical Address View project details and contacts
City, State (County) New Albany, IN   (Floyd County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

new kayak launch will be constructed at Providence Landing to provide access to Silver Creek for non-motorized watercraft. Concrete sidewalks, ramps, and steps will descend the hillside beneath the Spring Street bridge over Silver Creek. Project elements also include gabion and concrete retaining walls, rip rap and erosion control methods, lighting, landscaping, metal fabricated steps, handrailing, and a boat assist rail.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents