Similar Projects
4 - Lane Roadway Construction
Infrastructure
Conception
$36,600,000 CJ est. value
New London, MN 56273

Greenway Development: Minnesota River Greenway - Fort Snelling Segment - P00127 - Dakota County
Infrastructure
Conception
$7,425,139 CJ est. value
Eagan, MN 55123

The Emi - Mixed Use
New Construction - 53,584 SF
Design
$10,000,000 CJ est. value
Richfield, MN 55423

8567 Channel Crossing Replacement
Demolition, New Construction, Infrastructure
Design
$2,485,179 CJ est. value
Orono, MN 55356

Downtown Riverfront Improvements Phase 2
New Construction, Infrastructure
Bidding
$500,000 CJ est. value
Fergus Falls, MN 56537

Boathouse Bay Silver Bay, MN
Infrastructure
Bidding
$610,000 CJ est. value
Silver Bay, MN 55614

Taco Bell / Mankato
New Construction, Infrastructure - 2,867 SF
Sub-Bidding
$1,000,000 CJ est. value
Mankato, MN 56001

Satori Boutique Apartments
New Construction - 1,161 SF
Post-Bid
$34,800,000 est. value
Minneapolis, MN 55411

Agricultural Lab Building Infrastructure Improvements
Renovation, Alteration
Post-Bid
$19,126,000 est. value
Saint Paul, MN 55155

2021 Site Improvements
Results
Monticello, MN 55362

Eden Prairie Site Restoration
Results
Eden Prairie, MN 55347

Eagle's Landing Subdivison
Construction
Inver Grove Heights, MN 55076

Zumbrota Apartments
New Construction - 71,808 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Zumbrota, MN 55992

Gateway Housing
New Construction, Infrastructure - 75,899 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Burnsville, MN

PetSuites / Maple Grove
New Construction, Infrastructure - 11,000 SF
Pending Verification
$2,500,000 CJ est. value
Maple Grove, MN 55311

Last Updated 08/23/2022 12:02 AM
Project Title

30807 Water Lily Drive, Hinckley Garage

Physical Address View project details and contacts
City, State (County) Hinckley, MN 55037   (Pine County)
Category(s) Heavy and Highway
Sub-Category(s) Parking Garage, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Work Scope Description: Unless otherwise noted all work shall be completed according to the 2016 MLB Spec Book. Detached garage: a. Front of garage shall be approximately 30' back from edge of asphalt on Water Lily Drive. The left wall of the garage shall be 20' away from the right edge of asphalt on existing driveway. b. Prep site area for floating slab construction. Remove top soil and vegetation and install a 18" sand cushion. Form and pour 4" Thickened edge slab with vapor barrier per drawing detail. Include a course 6" wide x 8" high block around perimeter of slab to ensure 6" separation between bottom plate and finished grade. Elevation: top of floor shall be 6" higher than top of asphalt on Water Lily Drive at garage entrance driveway. c. Relocate detached 24 x 24' garage located at 30874 Water Lily Drive. d. Install garage on new slab. e. Include electrical as shown on plan. Install a 60 amp panel in garage with (2) 20 amp circuits. Supply and install meter socket on the exterior of the garage. Run underground secondary wiring to new staked transformer location. New transformer location is approx. 60' SE of the front right corner of the garage proposed location. f. Provide and install overhead garage door per spec. book. Door color shall be Sandstone. g. Demo and replace jamb flashing and weather stripping. New flashing shall be Clay in color. h. Demo & replace lock set per Spec Book. i. Demo and replace all damaged; or supply and install fascia flashing and soffits. New fascia and soffit color shall match existing. j. Supply and install gutters, downspouts, leaf guards and concrete splash pads. Gutters to discharge at rear of garage. (Match fascia/ soffit color) k. Demo and replace damaged; or supply and install missing siding, channel and accessories. Match existing garage siding color. l. Demo all existing exterior light fixtures. Supply and install new Patriot Lighting dualux LED dual head motion sensor exterior fixtures model: E9201WH. Include supply and install of all new LED bulbs. m. Pour a 4' concrete garage apron sloped down to driveway. Include #4 rebar reinforcement 24" o.c. and control joints no more than every 4'. Include an expansion joint at garage slab abutment. Driveway Construction: Left edge of new driveway shall be located approximately 24' to the right of the existing driveway's asphalt (measuring from straight edge of driveway not flared edge). This should leave approx. 20' between the existing driveway and the relocated garage's west-facing wall. Driveway shall be 20' wide with flared garage approach and 26' in length. Top of driveway should include a slight crown. Contractor shall construct new driveway as follows: Subcut for driveway base. Contractor is responsible for removal and export of any excess soils or fill quantities that cannot be used onsite. Contractor shall install 6" of class 5 material with 2" topping of reclaimed asphalt or crushed concrete. Grade work: a. Maintain level grade around perimeter of the garage slab 4' on front and sides and 6' at rear; then start sloping. This project is not subject to the no more than 12" drop in 10' restriction listed in the Spec Book. Final grade shall be within 1" of top of slab height. b. Ensure that the ditch created between the new garage and existing driveway will provide sufficient runoff. c. Contractor is responsible for regrading and seeding any areas of the yard that they damage. Include a $3,000 allowance to be used at Owner's discretion for additional excavation and/ or fill required for soil corrections discovered once work commences. No work shall be compensated if it was not approved by the Owner prior to completion. Mobilization and Project Schedule: The Contractor shall be capable of mobilizing his equipment, crews, and subcontractors within 30 days of notice to proceed. Project will be complete no later than July 31, 2023. General contractor expected to immediately, upon receipt of fully executed contract, source all required materials and products required for the project. Contractor must immediately notify project coordinator of items with long lead times that may impact project schedule. Contractor shall provide means and methods for all building phases of construction. Liquidated damages for exceeding specified timeframes will be in all contracts. COMMUNITY DEVELOPMENT/PROJECT MANAGEMENT RESERVES THE RIGHT TO REJECT ANY AND ALL BIDS FOR ANY REASON.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 21 - Fire Suppression.
Division 26 - Electrical, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents