Similar Projects
Reconstruction Of County Road H Between State Route 109 and Road 8 - 1
Bidding
$909,000 est. value
Wauseon, OH

Two Lane Resurfacing - FUL-SR 108-00.00 Resurf
Bidding
OH

Adrian Street Resurfacing
Post-Bid
Delta, OH

Partial Interchange Resurfacing Interchange
Post-Bid
OH

Asphalt Repair
Results
Swanton, OH 43558

Permanent Improvement Projects, Paving and Drainage
Results
Swanton, OH 43558

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Bidding

(Part A) Mainline Pavement Reconstruction Milepost 46.50 to Milepost 50.92 and (Part B)Toll Plaza 49 Site Construction Milepost 48.8 to Milepost 49.1
Results
$34,200,000 est. value

Metamora Fulton Street Reconstruction CDBG
Results
Less than $73,500 est. value
Metamora, OH

South Cherry Street Improvements Project
Results
Less than $25,400 est. value
Fayette, OH

Resurfacing of Township Roads B and 24
Results
Less than $529,800 est. value
Wauseon, OH 43567

Crack and Joint Sealant (MBE Only)
Term Contract
Results

2020 Fulton County Asphalt Resurfacing
Results
Less than $1,824,377 est. value
Wauseon, OH 43567

2020 Fulton County Seal Coat and Cold Mix Program
Results
Less than $571,246 est. value
Wauseon, OH 43567

Miscellaneous Street Resurfacing
Results
Less than $382,842 est. value
Archbold, OH

Last Updated 07/30/2020 12:48 PM
Project Title

Business East and Dodge South Alley Improvements

Physical Address View project details and contacts
City, State (County) Swanton, OH 43558   (Fulton County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $330,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the complete reconstruction of approximately 965' of Dodge South Alley from Dodge Street to North Main Street and approximately 680' of Business East Alley from Zeiter Way to Church Street. In addition to the reconstruction, the project includes storm sewer and waterline installation, as well as, related work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents