Similar Projects
Maintenance Roadway Contract N318
Infrastructure
Bidding
$5,000,001 to $10,000,000 est. value

Kearny Avenue Roadway Improvements (NJDOT Funded)
Post-Bid
Kearny, NJ 07032

2020 Miscellaneous City-Wide Pothole Repair - Phase 3
Post-Bid
Union City, NJ

FY 2018 Meadowlands Parkway Rehabilitation
Results
Secaucus, NJ 07094

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

2020 CDBG Road Reconstruction Program
Post-Bid
Old Bridge, NJ

Resurfacing Program 2019 - Various Locations
Results
Hoboken, Kearny, North Bergen, NJ

Secaucus Road Preservation
Post-Bid
Secaucus, NJ

Resurfacing Program 2018 - Various Locations
Results
Hoboken, Kearny, North Bergen, Secaucus, Union City, Weehawken, NJ

Bituminous Concrete Resurfacing - As Needed
Post-Bid
Jersey City, NJ

Improvements to John F. Kennedy Boulevard from 18th Street to 67th Street
Results
North Bergen, Union City, West New York, NJ

2019 NJDOT Roadway Preservation Various Street
Post-Bid
Hoboken, NJ

Central Avenue Streetscape Roadway Improvements
Results
Jersey City, NJ 07307

Asphalt and Miscellaneous Works
Alteration
Post-Bid
North Bergen, NJ

2020 Mill/Overlay Program
Results
Secaucus, NJ 07094

Reported 02/16/2022 12:00 AM
Project Title

Peter Street Extension

Physical Address View project details and contacts
City, State (County) Union City, NJ 07087   (Hudson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

he project consists of extending the existing Peter Street from Hudson Avenue to Palisade Avenue. Improvements include installation of a full depth pavement section, curb, scored sidewalk with decorative band, ADA compliant curb ramps, installation of lighting foundations, shade trees, rectangular tree wells, traffic markings, speed humps and regulatory and warning signs. Work shall also include construction of a dog park north of the proposed sidewalk, along the extension. Work associated with the proposed dog park includes installation of fencing and gates, an 8` X 12` pavilion, benches, water fountains, synthetic turf, and landscaping improvements including construction of proposed planter beds. This contract also includes improvements to Peter Street from Hudson Avenue to Park Avenue. Work from Hudson Avenue to Park Avenue includes widening of the existing cartway by removing the existing curb and four feet (4`) of existing sidewalk from the north side and installing two feet (2`) of sidewalk and curb. Work shall also include HMA milling and paving, installation of traffic markings, speed humps, and shade trees.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents