Similar Projects
Rehabilitation of Well No. 3A
Post-Bid
$125,000 est. value
Kilgore, TX 75662

Water Well No. 1 Replacement at Water Plant No. 1
Post-Bid
Less than $3,500,000 est. value
Houston, TX

Repair and Install Variable Frequency Drive on Irrigation Well 8
Results
Bushland, TX 79012

Saws Water Well Mitigation Program
Results
Less than $97,000 est. value
San Antonio, TX

Water System Improvements Project - Well No. 4
Post-Bid
Spicewood, TX 78669

Water Well Facilities for Pinewood Trails
Results
Less than $2,389,444 est. value
Cleveland, TX 77327

City of Alice Test Drilling and Production Well Construction
Post-Bid
TX

Exploration Well
Results
$176,600 est. value
Bullard, TX 75757

Water Wells for Big Sky Estates Phase 1
Post-Bid
$700,000 est. value
Denton, TX 76201

Water Well No. 4 at Water Plant No. 1
Results
Less than $1,450,000 est. value
TX

New Water Well
Post-Bid
$1,050,000 est. value
Jacksonville, TX 75766

Remote Water Well and Water Plant No. 1 - Phase 2
Results
Less than $1,779,480 est. value
Brookshire, TX 77423

Water Well and Plant Facilities - Site No. 1 Expansion
Post-Bid
Houston, TX

Water Treatment Plant Facilities Pump and Motor Maintenance and Repair Services
Results
Less than $2,762,500 est. value
Round Rock, TX 78664

Replace Four Fuel Pumps and All Equipment
Post-Bid
Carthage, TX 75633

Last Updated 06/30/2021 04:27 PM
Project Title

Water Reuse Effluent Pump Back

Physical Address View project details and contacts
City, State (County) Electra, TX 76360   (Wichita County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,522,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

HUB Goal 11.2%. Construction of an effluent water pump back system that will collect wastewater from fish rearing ponds and pump it back into Lake Diversion; includes the following 18” PVC Gravity Main, Junction Structures, Pump Station, 16” Force Main, and Discharge in Lake Diversion.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents