Similar Projects
NASCAR Speedway Commerce Center Business Park / Lincoln
New Construction, Infrastructure - 3,000,000 SF
Conception
$640,000,000 CJ est. value
Lincoln, AL 35096

NASCAR Speedway Commerce Center Business Park / Lincoln
New Construction, Infrastructure - 3,000,000 SF
Conception
$640,000,000 CJ est. value
Lincoln, AL 35096

Wellborn Cabinet Expansion / Oxford
Demolition, New Construction, Infrastructure - 250,000 SF
Design
$17,000,000 CJ est. value
Lincoln, AL 35096

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Demolition of Existing Pool Area and Site Development for New Splash Pad
Demolition, Infrastructure
Post-Bid
Sylacauga, AL 35150

Constructing the Safety Widening, Planing, Resurfacing, Bridge Rail Retrofit, Guardrail Installation, and Traffic Stripe on SR-275/SR-21 from 0.150 mile south of the intersection of Shocco Springs Road in Talladega to 0.390 mile north of the junction of CR-91/CR-321 (Stockdale Road)
Infrastructure
Results
$8,301,912 to $10,146,781 est. value
AL

East Street North Pocket Park
Infrastructure
Results
$700,000 CJ est. value
Talladega, AL 35160

Paving Projects at Indian Valley Elementary School, Pinecrest Elementary School, Nichols-Lawson Middle School and Sylacauga High School
Infrastructure
Post-Bid
Sylacauga, AL 35150

Hickory Street Ditch Rehabilitation
Infrastructure
Results
$1,002,375 CJ est. value
Sylacauga, AL 35150

Concrete Street Repairs
Infrastructure
Post-Bid
Sylacauga, AL

Priebes Mill Road Water Main Extension (nr)
Infrastructure
Post-Bid
$400,000 CJ est. value
Oxford, AL 36203

Addition and Renovations to Cafeteria at Salter Elementary School
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$480,000 CJ est. value
Talladega, AL 35160

Paving for Talladega County Central High School
Infrastructure
Post-Bid
$662,000 CJ est. value
Talladega, AL 35160

Willman Road Culvert Replacement Project
Infrastructure
Post-Bid
$300,000 CJ est. value
Talladega, AL 35160

Stemley BPS Replacement and New 10" Water Main Project
Renovation, Infrastructure
Post-Bid
$600,000 CJ est. value
Talladega, AL 35160

Last Updated 04/29/2023 08:33 AM
Project Title

Constructing the Micro-Milling, Resurfacing, Guardrail Installation, and Traffic Stripe - SR-38

Physical Address View project details and contacts
City, State (County) Sylacauga, AL 35150   (Talladega County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $5,010,915 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

For constructing the Micro-Milling, Resurfacing, Guardrail Installation, and Traffic Stripe on SR-38 (US-280) from the Shelby County Line to the junction of CR-25 (MP 37.455) northwest of Oak Grove. Length 4.912 mi. The Bracket Estimate on this project is from $4,869,132 to $5,951,161 . A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $4.00 per set. Contract Time: 95 Working Days If further clarification is needed, please contact the Plans and Proposal Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 016 Constructing the Micro-Milling, Resurfacing, Guardrail Installation, and Traffic Stripe - SR-38 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents