Similar Projects
Valley Stream 30 Union Free School District Improvements
Renovation
Conception
$6,000,000 CJ est. value
Valley Stream, NY 11580

Forest Lake Elementary School - 2022 Bond Proposition 3 - Wantagh Union Free School District - 6097149
Renovation
Conception
$650,000 CJ est. value
Wantagh, NY 11793

Ventilation Upgrades at the Fairfield Elementary School - Contract G General Construction Work - Rebid
Renovation
Bidding
$374,000 CJ est. value
Massapequa, NY 11758

Bond Phase 2B Building Improvements at Bethpage High School and Kramer Lane Elementary School
Renovation
Bidding
$300,000 CJ est. value
Bethpage, NY 11714

Bond Phase 2b Building Improvements @ Bethpage HS & Kramer Lane ES
Renovation
Sub-Bidding
$400,000 CJ est. value
Bethpage, NY 11714

The Henry Viscardi School (Fire Alarm)
Renovation - 160,000 SF
Post-Bid
Albertson, NY 11507

The Viscardi Center Snow Removal
Term Contract
Post-Bid
Albertson, NY 11507

Great Neck U.F.S.D. Interior at Phipps
Alteration
Results
$250,000 est. value
Great Neck, NY 11020

2021-2022 Capital Improvement Program - Contract #1 -Roof Replacement
Demolition, Alteration - 1,600 SF
Results
Manhasset, NY 11030

Mandalay Elementary School Window Replacement - 2022 Bond Proposition 1 - Wantagh Union Free School District
Renovation
Pending Verification
$3,803,000 CJ est. value
Wantagh, NY 11793

Unit Ventilator Replacement - 2022 Bond Proposition 1 - Wantagh Union Free School District
Renovation
Pending Verification
$19,800,000 CJ est. value
Wantagh, NY 11793

Mandalay Elementary School - 2022 Bond Proposition 3 - Wantagh Union Free School District - 6097149
Renovation
Conception
$645,000 CJ est. value
Wantagh, NY 11793

Emergency Soffit Repair at the Rosemary Kennedy Center
Renovation
Bidding
$365,000 CJ est. value
Wantagh, NY 11793

Roosevelt Children`s Academy Charter School
Renovation
Post-Bid
Roosevelt, NY 11575

Interior Vestibule Reconstruction
Renovation
Results
Bellmore, North Bellmore, North Merrick, NY 11710

Last Updated 03/17/2023 12:37 PM
Project Title

Capital Projects at JFK Elementary School

Physical Address View project details and contacts
City, State (County) Great Neck, NY 11024   (Nassau County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $694,475 [brand] Estimate
Plans Available from Copy Center - 01/23/23
Owner View project details and contacts
Architect View project details and contacts
Description

Capital Projects at JFK Elementary School. The Contract Documents may be examined at the Office of the Architect, BBS Architects, Landscape Architects and Engineers, P.C., 244 East Main Street, Patchogue New York, (631-475-0349). Checks for deposits shall be made payable to the GREAT NECK UNION FREE SCHOOL DISTRICT and may be uncertified. All bid addenda will be transmitted to registered plan holders via email and will be available at the above referenced websites. Any bidder requiring documents to be shipped shall make arrangements with the printer and pay for all packaging and shipping costs. Plan holders who have obtained hard copies of the bid documents will need to make the determination if hard copies of the addenda are required for their use, and coordinate directly with the printer for hard copies of addenda to be issued. The bid deposit for hard copies will be returned upon receipt of plans and specifications, in good condition, within thirty days after bid date, except for the lowest responsible bidder, whose check will be forfeited upon the award of the contract. The Contract will be awarded to the lowest responsible bidder or the bids will be rejected within 45 days of the date of opening. The School District reserves the discretionary right to waive any informalities, to accept or reject any alternatives, or to reject all bids and advertise for new bids if in its opinion the best interest of the School District will thereby be promoted. Bidder may not withdraw its bid until forty-five (45) days after the bid opening, except in accordance with General Municipal Law Section 103(11). There will be no charge for registered plan holders to obtain hard copies of the bid addenda.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents