Similar Projects
University of Wisconsin Stout Campus Heating Plant Chimney Repairs
Renovation
Design
$1,788,000 CJ est. value
Menomonie, WI 54751

University of Wisconsin/Madison Campus - Phillips Hall Renovation - University of Wisconsin System - Administration
Renovation
Design
$2,977,000 est. value
Madison, WI 53706

Fire Suppression System Renovation GPC
Renovation
Bidding
$540,000 CJ est. value
Madison, WI 53706

Barstow Science Laboratory and Applied Research Renovation GPC
Infrastructure
Bidding
$2,760,000 CJ est. value
Superior, WI 54880

CVTC Transportation Education Center Phase II
New Construction - 120,000 SF
Post-Bid
$29,800,000 est. value
Eau Claire, WI 54703

UWHC A7/B6-2 Infection Disease & Pulmonary Services Lab
Renovation
Post-Bid
Madison, WI 53792

New CDIS Building A/E Qualifications
New Construction, Addition
Results
$150,000,000 est. value
Madison, WI 53715

Biochemistry Cryo-Electron Microscopy Renovation -General
Renovation
Results
Less than $1,400,000 est. value
Madison, WI 53706

Truax Campus Civil, Interior Design, Architecture Remodel
Renovation
Construction
Madison, WI 53704

Demolition of Equipment Storage Buildings #3 and #4
Renovation - 18,100 SF
Construction
$194,999 CJ est. value
Milwaukee, WI 53212

Marquette University - Master Plan
Demolition, New Construction, Infrastructure, Renovation
Pending Verification
$449,500,000 CJ est. value
Milwaukee, WI 53202

Graff Main Hall HVAC System Renovation - University of Wisconsin/La Crosse
Renovation
Pending Verification
$10,639,000 CJ est. value
La Crosse, WI 54601

Medical College of Wisconsin Cancer Research Facility
New Construction, Infrastructure - 150,000 SF
Design
$153,000,000 CJ est. value
Wauwatosa, WI 53226

UW-Madison School of Computer, Data & Information Sciences (CDIS)
New Construction, Infrastructure - 327,000 SF
Bidding
$176,000,000 CJ est. value
Madison, WI 53706

UWHC John Wall Dr Warehouse Build-out
New Construction
Post-Bid
Madison, WI 53704

Last Updated 11/10/2022 01:43 PM
Project Title

3rd Floor Renovation Goodhue Hall

Physical Address View project details and contacts
City, State (County) Whitewater, WI 53190   (Walworth County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $410,937 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. If a project does not include any mechanical, electrical, plumbing, or fire protection divisions of work, DFD will bid one bid package for all work to general prime contractors. In general the work consists of a 3 rd floor dormitory remodel that includes new architectural finishes and minor cabinetry, running a new water service to the building, installing a sprinkler riser in the building and installing a sprinkler system on the 3 rd floor of the building. The project includes complete remodeling of both of the 3 rd floor toilet / shower rooms, installing new electrical panels on the 3 rd floor, new power distribution and lighting on the 3 rd floor and minor HVAC work on the 3 rd floor. Base Bid will be received for: A single lump sum bid for All Work. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. Custom Bid Results FIRE PROTECTION Automatic Fire Systems, Inc. - 56,254.00 PLUMBING H.J. Pertzborn Plumbing & Fire Protection - 82,828.00 ELECTRICAL Premier Power Professionals, Inc. - 271,855.00

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents