Project Title | Demolition Services |
Physical Address | View project details and contacts |
City, State (County) | Ferguson, MO 63135 (Saint Louis County) |
Category(s) | Single Trades |
Sub-Category(s) | Environmental |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $350,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The City of Ferguson is seeking proposals from qualified demolition companies to perform demolition services for fifty (50) or more residential properties for no more than $350,000 total cost incurred by the City. The City reserves the right to reject any and all proposals and to waive any irregularities in the process or with regard to the proposals. The City of Ferguson is an Equal Opportunity Employer and invites the submission of proposals from minority and women-owned firms. Questions regarding this Request for Proposals shall be made to David Musgrave, Parks Director at 314-524-5070 or dmusgrave@fergusoncity.com . The City of Ferguson will be acquiring the properties for the purpose of removing a public health and safety hazard. Therefore, the City of Ferguson desires to procure a demolition company to remove all homes and accessory structures from the properties listed below 522 Plantmore Dr 501 Abston Ave 7 Dadebridge Ct 8 Dadebridge Ct 552 Ford Ave 812 Ford Ave 523 Graf Ave 526 Graf Ave 610 Graf Ave 301 Henquin Dr 425 MuellerAve 208 N Harvey Ave214 NEWELL DR 7 Manor Ln 146 Powell Ave 321 S Dade Ave 401 S Dade Ave 405 S Dade Ave 119 S Harvey Ave 511 Suburban Ave 830 WaltersDr 238 Wesley Ave 815 Arline Dr 6176 Behle Ave 7534 Blanding Dr 6131 Dupree Ave 6154 Dupree Ave 5990 Dupree Ave 6129 Dupree Ave 6151 Dupree Ave 6159 Dupree Ave 6170 Dupree Ave 619 Brotherton Ln 6205 Emerald Ave 6141 Emerald Ave 6125 Emerald Ave 6159 Emerald Ave 6167 Emerald Ave 434 Harrison Ave 5834 Lagonda Dr 5840 Lagonda Dr 6173 Payne Ave 6138 Payne Ave 7557 Rowles Ave 801 Rowles Ave 7550 Rowles Ave 409 Thomas Ave 705 Wiegel Ave March 10, 2023 Award Contract to Selected Company April-June 2023 Perform Demolitions as per the contract 1. The project shall include the demolition and removal of all construction materials, roofing, siding, wood, bricks, concrete foundations, driveways, footings, and basement floors. 2. The contractor shall start work immediately upon City's issuance of the Notice to Proceed. The City shall issue a Notice to Proceed for each property. Demolition for each structure shall be completed within 60 days of the Notice to Proceed. The contractor is expected to be working on several demolitions covered by the agreement at one time. It is imperative the structure is demolished within 60 days of the Notice to Proceed. 3. The contractor is responsible for acquiring all demolition and waste disposal permits from St. Louis County - Health Department and the City of Ferguson. Fees for the City of Ferguson permits shall be waived. The contractor will also have each property tested for asbestos and lead prior to demo as per St Louis County Department of Health guidelines. 4. Disconnecting and capping water and sewer lines will be completed by the contractor. Since this is also part of the City of Ferguson Demolition Permit process, the appropriate utility company and the City of Ferguson will inspect theseactivities to ensure full compliance is met. In one instance a water line may remain on the site, the City will provide the necessary plumber to conduct any needed work if needed. 5. If it is determined that clean fill from a borrow site is needed to infill any basement, crawls space, or footings encountered, the borrow site shall be submitted to the City for review and approval. 6. HVAC units, florescent light fixtures, and similar hazardous items must be removed and disposed in the appropriate manner. 7. If asbestos is found in any of the homes, it will be removed by a Missouri DNRlicensed asbestos removal contractor and sent to a landfill approved by the Missouri Department of Natural Resources. This will be transacted as a change order to the original bid price. The contractor will procure at least two bids for remediation services and the city will be allowed to review the bids prior to award. 8. Appropriate erosion control measures will be in place to assure that no sediment enters and waterway or storm water conveyance. Silt fencing shall be placed between the demolition area and any watercourse to capture potential runoff /or debris. 9. The contractor shall erect temporary plastic safety fencing around the perimeter of the site, to ensure all debris/solid waste is captured and disposed in the appropriate manner. 10.There shall be no burning of debris onsite. 11.There shall be no onsite fuel storage for the equipment. 12.It will be the responsibility of the contractor to ensure equipment is properly maintained and in appropriate working order, to avoid oil and gas leakage. 13.The area where the buildings are to be removed will be properly graded and seeded with native and/or adaptive vegetation. All existing vegetation shall remain untouched and in place where possible Questions regarding this Request for Proposals shall be made to David Musgrave, Parks Director at 314-524-5070 or dmusgrave@fergusoncity.com . |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |