Similar Projects
SR 4012 over Robinson Run-1-DFB
Renovation, Infrastructure
Conception
$200,000 est. value
Washington, PA

Us 22/322 Pm
Infrastructure
Conception
$2,850,000 est. value

Pigeon Creek Pump Station Outfall and West Alley Repairs Project
Infrastructure
Design
$60,000 CJ est. value
Monongahela, PA 15063

SR 4022 over Bridge Buffalo Creek
New Construction, Infrastructure
Design
$2,300,000 est. value
PA

Vankirk Road Improvement Project
Infrastructure
Bidding
$550,000 CJ est. value
North Franklin Township, PA 15301

Vankirk Road Improvement Project
Infrastructure
Bidding
$550,000 CJ est. value
North Franklin Township, PA 15301

Troop B, Washington HDQ Snow Removal
Term Contract
Sub-Bidding
Eighty Four, PA 15330

Districtwide Cable Median Guiderail
Infrastructure
Sub-Bidding
$99,999,999 CJ est. value
East Finley Township, PA 15323

Aggregate Material
Post-Bid
Washington, PA

2021 Pavement Maintenance Program Contract A, B
Post-Bid
Houston, PA

SIP 12-20-SI4-1
Results
$2,500,000 to $4,999,999 est. value
PA

2020 Pavement Rehabilitation Project
Results
Canonsburg, PA

Magic City Riverfront Park Improvements - Phase I
Renovation
Construction
$254,000 est. value
Charleroi, PA 15022

Field 5 Turf Replacement - Peters Township
Infrastructure
Conception
$1,000,000 est. value
Venetia, PA 15367

Pa 88 Nb Charleroi Cmaq
Alteration
Design
$135,000 est. value
Finleyville, PA 15332

Last Updated 08/03/2022 08:31 AM
Project Title

Fredericktown Gateway Park - Phase I

Physical Address View project details and contacts
City, State (County) Fredericktown, PA 15333   (Washington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $140,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Fredericktown Gateway Park Phase I Project includes selective site demolition, site grading, the installation of concrete and gravel walkway, splash pad, site utilities including water and electric services, landscaping, lawn/asphalt restoration and other work as indicated by the Contract Specifications. The Owner reserves the right to increase/decrease item quantities up to twenty (20) percent without negotiation of unit prices in the event that budget constraints so dictate. The Owner reserves the right to reject any or all of the bids, or to waive any errors, omissions, defects, or informalities, and to award the contract as may be deemed in the best interest of the Owner. This Project was financed in part by a grant from the Commonwealth of Pennsylvania, Commonwealth Financing Authority. All Bidders on this work will be required to comply with the Contract Compliance Regulations of the Pennsylvania Human Relations Commission, 16 PA Code Chapter 49 and with all laws prohibiting discrimination in hiring or employment opportunities. The Bidders are encouraged to inspect and review the project prior to submitting a bid.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents